
Linn High Therm GmbH
HT-1500-GT-VAC-Spezial GRAPHITE
page
14
operating instruction issue 30.10.2018
_____________________________________________________________________________________________________
GT version
pic. 2.4 Mounting of heating elements GT version
Connect to mains, mounting of connecting clamps
Depending on the version connecting clamps can vary in length and bores. Most
clamps are premounted and are used to connect two heating elements. Also, contact
rails can be included in supply to shunt two heating elements. Pictures explaining
electrical connection are attached to this section.
At first, plastic section which secured for transportation must be unscrewed from the
connecting clamp. Push clamp carefully over the heating element, connecting ends
will take place of plastic section. Position connecting clamps according to the
matching picture and then close screws tightly.
Mount contact rails if indicated.
Mounting is finished after having checked picture for connecting and that all screws
are fitting tightly.
Remaining assembly
Mounting cover of furnace chamber, make sure that silicon sealing remains clean in
furnaces with protective gas operation and that it fits to sealing area between furnace
chamber and it’s cover.
Installation of fanning cover and rear wall of furnace casing same as dismounting in
opposite order.