
Step 11: Ionizer (optional)
Connect the ionizer to the power cord and then hang it at the pre-marked location in the infrared cabin.
Fasten the ionizer using the existing screws.
Step 12: Cup holder (optional)
Place the cup holders in the left and right front corners.
Step 13: Door handle
Depending on the model, there are two different methods for installing the door handle.
Method 1:
Method 2:
Step 14: Power
The last step is to connect the infrared cabin to the circuit.