INSTALLATION PROCEDURE (For wall mounting only)

1. Use the supplied mounting accessories to mount the device (Fig1).

2. 

Remove the four cover retaining screws 

(

Fig 

1

)

.

3. Install the battery cable connectors to the batteries taking care of the polarity, black cable (-)
    and red cable (+).
4. 

Always use in any case round mains cable

,

 with external diameter

 

of 

6-9

mm (H05RN-F

    type 2x1mm² or any other type, at least equal to it’s mechanical and electrical
    properties). ATTENTION!! The cable must not be deformed in any way (This
    requirement is important  to ensure the tightness isolation IP65). 

Install

 

the cable gland

,

    pass the round cable through and tighten it all the way. 
5. Connect the cables to the respective positions in the terminal block 

L for phase and N for

    neutral

.

6

Reinstall the front cover and fasten the retaining screws. (Tightening torque

 1

Nm

). 

    

Pay attention to the 4 sealing o-rings.

WARNING!! 
After the installation has finished, charge the batteries for at least 24 hours so as to 
obtain the rated autonomy duration

.

 

Page 2 from 3

    case of less time than the minimum
    autonomy duration the batteries must be
    replaced. If the measured time is
    considerably less than the minimum
    autonomy duration 

contact the installer.

    The replacement of the battery and the
    light source must be done using parts of
    the same type, by the manufacturer or by a
    competent person.

5. 

In case of inactive use for a period greater

    than 2 months, disconnect the battery by
    pulling out the battery’s connector.

6. 

I

s not allowed to discard batteries in 

t i

to common trash bins, they must be 
discarded only 

 in battery recycling 

points. Do not incinerate.

Battery replacement 

It can be done only by a competent person 
and after the mains interruption.

1.

 Follow the step 2 

of the installation

    

procedure.

2.

 Disconnect the 

cables and remove the old

    

battery.

3.

 Connect the new battery with the same type

    

(step 3 of the installation procedure) and

    

place it in the position  of the old one.

4.

 Follow the step 

6 of the installation

    

procedure and power the device.

(*) Non Maintained operation: The luminaire lights 
its illumination source, only in  power supply’s 
failure.
Maintained operation: The luminaire lights its 
illumination source, when it is powered by the 
mains power supply or not

.  

 

NOTE: 

LED= Light Emitting Diode

LABELING EXPLANATION:
X: 

Self contained 

  

0: 

Non Maintained (*)

A: 

Including test device

90: 

1.5 hour duration 

18

0: 

3 hours duration 

The light source contained in this luminaire shall only be replaced by the manufacturer, or 

his agent, or a similar qualified person.

NOTE! The light source is non-user replaceable.

INDICATION LED STATUS (with the mains power supply connected

)

CHARGE

POWER

Disconnected battery

 / 

not charging

Charged battery

Normal operation mode

No mains power supply

Indicator ON

Indicator OFF

 

LED CHARACTERISTICS

Linergy s.r.l

.

Cable connection between main pcb and led module

Manufacturer

Model Number
Voltage Range

Connections

Nominal Power

Temperature (tc

)

DU239P13EGS

DU239P30EGS

68 °C max.

17.5-20.5V

14W

1005183

TEST

button

Fig

.

 1

Power

indicator

Mounting holes

Charge

indicator

Cover

retaining 

screws

4

L

N

3

ISTDUALLED_V2-R2