Linear 6-12 SECTION Скачать руководство пользователя страница 15

PAGE 15 

BIASI B/40 

 

 

 

 

All piping must conform to state and local codes. 

 

 

The supply and return manifolds for B-40 Linear boilers are 2 1/2” male NPT.  Be sure to 

provide unions and gate valves at the manifold inlet and outlet of the boiler, so the boiler  may be 
readily isolated for service. 
 

Install the provided pressure relief valve so the discharge is piped directly to a drain, if 

possible. If not, the discharge should be piped to the floor. In either case, the discharge pipe should be 
of the same diameter as the outlet of the relief valve, with no valves or obstructions to impede 
overflow from the boiler.  The installation locations on the manifold for the Pressure Relief Valve, the 
Temperature/Pressure Gauge as well the Honeywell L4006E Aquastat can be seen on the following 
page. 
 

Install manual and/or automatic air venting devices at the high points in the system to eliminate 

trapped air. 
 

The weight of all piping should be supported by suitable hangars and floor stands, not by the 

boiler. 
 

It is recommended that the make-up water line have a backflow preventer and a pressure-

reducing valve to reduce line pressure to 10 to 15 psi installed adjacent to the boiler. 
NOTE: If the heating system is to be filled with antifreeze, use only formulations expressly made for 
hydronic heating systems (such as propylene glycol).

 Do not use automotive types of antifreeze 

(ethylene glycol).

 Use of antifreeze will alter system output and characteristics. Consult factory rep's 

for details or assistance. 
 

Clearance for hot water pipes are 1 inch to combustibles.

 

11. Piping:

 

1.  Pierce a 5/8” hole into the vent pipe near the appliance outlet.  Remove one of the securing nuts 

from the pipe of the safety switch.  Tighten the other securing nut onto the pipe as far as possible. 

2.  Insert the threaded pipe end into the pierced hole, then install the securing nut, then install the se-

curing nut, which was removed in step 1, and tighten securely. 

3.  Please consult the wiring section of this manual for the wiring of the blocked flue switch. 

10.  Blocked Flue Switch:

 

Содержание 6-12 SECTION

Страница 1: ...UTH NH 0380 PORTSMOUTH NH 0380 PORTSMOUTH NH 0380 PORTSMOUTH NH 03801 1 1 1 PHONE 603 PHONE 603 PHONE 603 PHONE 603 334 334 334 334 6400 6400 6400 6400 FAX 603 FAX 603 FAX 603 FAX 603 334 334 334 334...

Страница 2: ...lines rather than specific recommendations We realize that other makes and models of such devices are available and can be used as successfully as those we specify The installing contractor is the bes...

Страница 3: ...er Location 5 7 Boiler Block Assembly 6 8 Boiler Trim Kit Installation 7 8 Boiler Tapping Diagram 9 Burner Set up 8 10 Gas Piping 9 12 Breeching and Chimney 10 14 Piping 11 15 Boiler Jacket Assembly 1...

Страница 4: ...operating properly when the installation is completed Do not burn volatile garbage gasoline naphtha or other flammable liquids other than No 2 fuel oil All flammable liquids especially gasoline chemi...

Страница 5: ...g flu season A victim may not experience any symptoms only one symptom or a few symptoms Suspect the presence of carbon monoxide if symptoms tend to disappear when you leave your home The following si...

Страница 6: ...ontent Gals Length L inches Weight LBS B40 6 6 265 2 20 308 230 86 0 17 34 8 902 B40 7 7 352 2 90 406 305 86 7 20 39 5 1023 B40 8 8 437 3 60 504 380 86 8 23 44 4 1144 B40 9 9 524 4 30 602 456 87 0 26...

Страница 7: ...AL In general boiler rooms should incorporate two 2 permanent air supply openings one commencing within 12 inches of the ceiling and one commencing within 12 inches of the floor These openings should...

Страница 8: ...rter draw rods are installed on the bottom of the boiler The bottom draw rods should not extend past the front section Draw the sections together until sections make iron to iron contact at a point ar...

Страница 9: ...the location and function of the front and rear boiler tappings Boiler Model Length L B 40 6 34 8 B 40 7 39 5 B 40 8 44 5 B 40 9 49 2 B 4 10 53 9 B 4 11 58 8 B 4 12 63 9 2 5 MPT Return 2 5 MPT Supply...

Страница 10: ...L FULL Nozzle 2 00 X 45 2 25 X 60 2 75 X 60 3 25 X 60 3 75 X 60 4 5 X 45 5 50 X 45 Spray Pattern solid solid solid solid solid solid solid Pump Pressure 140 psi 170 psi 175 psi 175 psi 175 psi 160 psi...

Страница 11: ...1 Setting the electrode and flame rod settings against manufacturer s specs to insure proper operation 2 Installing properly sized gas piping according to BTU input required and length of gas line ru...

Страница 12: ...1 for proper sizing of gas piping for various lengths and diameters Locate a drop pipe adjacent to but not in front of the boiler Locate a tee in the drop pipe at the same elevation as the gas inlet c...

Страница 13: ...union 4 A drip pipe Caution The gas valve should not be subjected to more than PSIG Therefore the burner should be isolated during high pressure gas leak tests The appliance and its individual shut o...

Страница 14: ...and 400F gross stack temp so caution should be used when connecting to an outside built chimney Should you have concern that the flue gases could condense then you should consider using a listed powe...

Страница 15: ...hould be supported by suitable hangars and floor stands not by the boiler It is recommended that the make up water line have a backflow preventer and a pressure reducing valve to reduce line pressure...

Страница 16: ...BIASI B 40 PAGE 16...

Страница 17: ...nd screw on the threaded hex spacers 87 onto the studs Attach the lower mounting bracket 83 to the boiler by using two bolts 89 and screw ing them into the threaded hex spacers Then using sheet metal...

Страница 18: ...er shall come from a dedicated breaker in the electric service box A service switch should be mounted on the side of the boiler so the burner man can service the burner and controls The electrical wir...

Страница 19: ...the manual high limit 5 Circulator Switch Supplies power to boiler circulator or relay panel It is not suggested to use this switch and it is not utilized in any of the suggested wiring diagrams in th...

Страница 20: ...BIASI B 40 PAGE 20 B 40 Control Panel Wiring Diagram for Beckett Heat Wise Oil Burner 24V CIRCULATOR RELAY BURNER CONTROL...

Страница 21: ...PAGE 21 BIASI B 40 B 40 Control Panel Wiring Diagram for Beckett Heat Wise Oil Burner Line Voltage CIRCULATOR RELAY BURNER CONTROL...

Страница 22: ...BIASI B 40 PAGE 22 B 40 Control Panel Wiring Diagram for Riello Oil Burner...

Страница 23: ...PAGE 23 BIASI B 40 B 40 Control Panel Wiring Diagram for Heat Wise Gas Burners CIRCULATOR RELAY Burner Primary Control...

Страница 24: ...he flexible oil line Brush and vacuum combustion chamber and flue passages until all deposits are removed Reassemble components in reverse order making sure any damaged gaskets are repaired or replace...

Страница 25: ...________________ ______________________ _________________________ ______________________ Burner Manufacturer Type of Oil Burner Burner Model No Burner Serial No Nozzle Manufacturer Nozzle Spray Angle...

Страница 26: ...BIASI B 40 PAGE 26...

Страница 27: ...PAGE 27 BIASI B 40...

Страница 28: ...lled with approved burner and that installation conforms to all codes and ordinances 4 This warranty does not apply to boilers which are subject to misuse abuse neglect alteration accident excessive t...

Отзывы: