LTL TATM LTL - Vol 1
Issue 1.0
3
There are three separate sets of mooring points:
Mooring point:
Description:
Attached to:
Equator Rope
The equator of the net has 16 winch
mooring lines. These are fastened to the 16
mooring winches which are set around the
main winch at a diameter of 23 metres.
USED FOR BOTH HIGH and LOW MOOR
MOORING
WINCH DRUM
Polar Rope
The upper section of the net has 16 tether
lines. These are fastened to concrete hard
points which are set around the main winch
at a diameter of 50 metres
USED FOR BOTH HIGH and LOW MOOR
2.5 TONNE
RATCHET
STRAP
Outer mooring winch
option
Used for both High and Low Moor
MOORING
WINCH DRUM
Lower apex mooring
The lower apex of the envelope has 8 load
patches fixed to it. Straps are fastened to
these load patches and anchored to hard
points set into the concrete base supporting
alternate mooring winches.
LOW MOOR ONLY
2.5 TONNE
RATCHET
STRAP
The HiFlyer is able to rotate on a swivel connection, which is situated between the main winch cable
and load ring assembly. This means that the mooring lines on the net and envelope cannot always be
attached to the same mooring point.
Sections 3.4, 3.5 and 3.6 describe how to moor and un-moor the HiFlyer from the high and low
positions