ˇ
13
13.
Putting into operation:
The device requires professional installation by a qualified firm including training of
the operator (owner) and operating staff.
1. Interconnect the cooled water circuit. Insulate the tubing.
WARNING: The reverse line (reverse) must be submerged under the
water level in the tank.
2. Fill the tank with clean water or glycol in accordance with point 15.
3. Connect the cooler to the power mains.
4. Plug the pump cable into the socket on the control panel.
5. Check that all the joints and connections are sufficiently tightened.
WARNING: If you discover a leak, turn off the device. Fix any leaks
found on the tubing. If a leak is found inside the device or you are
unsure how to proceed, contact a service centre.
6. Set the desired temperature on the thermostat
– see point 12.
7. Turn on the device using the main switch.
8. The beverage is now cooling.
9. Check the water level in the tank and refill if needed.
WARNING: BEFORE STARTING THE DEVICE, FILL THE TANK WITH CLEAN
WATER. DO NOT USE ANY CHEMICAL AGENTS. COULD CAUSE DAMAGE TO THE
COOLING SYSTEM. FOR SPECIAL APPLICATIONS REQUIRING COOLING TO SUB-ZERO
TEMPERATURES, IT IS POSSIBLE TO USE AN ECO-FRIENDLY ANTIFREEZE MIXTURE
BASED ON PROPYLENE GLYCOL.
Содержание VCH 02237 AS-200-us
Страница 14: ...14 14 Interconnecting beverege tubing The figure shows a model example of connection...
Страница 16: ...16 3 Pour water all the way up to the overflow 4 Replace the lid and secure it with screws...
Страница 20: ...20 Warning Disconnect the device from power before cleaning the condenser 1 2 3...
Страница 21: ...21 4 5...
Страница 25: ...25 25 Wiring diagram...
Страница 26: ...26 26 Cooling diagram...
Страница 27: ...27...
Страница 28: ...28...