Lincoln IMPINGER 1400 Скачать руководство пользователя страница 11

Impinger I – Operator Manual 

11

LINCOLN IMPINGER

®

 OVEN, MODEL SERIES 1400 

DOUBLE DECK OR SINGLE UNIT CANOPY VENTILATION RECOMMENDATIONS 

 

 

* AFF = Above Finished Floor

 

 
 

 
SMOKE CANDLE TEST – VENTILATION SYSTEM VERIFICATION 
 

OVEN SET-UP FOR THIS TEST: 

 

1.  This test is to be done on the bottom oven of a multiple oven system, or a single oven. 
2.  The conveyor must be off. 
3.  The oven temperature must be set and operating at 550°F/288°C. 
 
TEST PROCEDURE

:

 

 

Note: Use Lincoln Smoke Candle #369361 (in Australia, an alternate method of coloring the air may be used). 
1.  Wear heat resistant gloves to prevent burns to your hands. 
2.  Put the smoke candle in a cake pan approximately 8 inches (200 mm) x 8 inches (200 mm) x 2 inches (50 mm) 

deep or equivalent. 

3.  Open the optional access window in the oven door, or insert candle through conveyor opening. 
4.  Light the fuse of the smoke candle and immediately put the pan and candle into the center of the oven cavity, 

on the conveyor belt.  (Close the access window or door.) 

5.  Observe the smoke pattern coming out of the oven openings and the collection of this smoke by the ventilation 

system. 

6.  The ventilation system must capture all the smoke from the oven. 
 
 
 
 

Capture Area 

Capture Area 

Содержание IMPINGER 1400

Страница 1: ...rica Technical Support Hotline 800 678 9511 Telephone 260 459 8200 www lincolnfp com operator manual This document includes Safety Notices Specifications Installation Instructions Operating Instructio...

Страница 2: ...stallation adjustment alteration service or maintenance can cause property damage injury or death NOTE Do not work around conveyor belt with long hair loose clothing or dangling jewelry Getting caught...

Страница 3: ...rvice Technician or a Lincoln Foodservice Products Service Representative This service is required by Lincoln Foodservice Products LLC in order to assist the purchaser in proper start up of the oven o...

Страница 4: ...ica T Mandarin China H Portuguese Portugal U Restricted I Not Used V English Pacific Rim Korea J Danish Denmark W English Middle East K Dutch French Belgium X Not Used L Dutch Netherlands Y Not Used M...

Страница 5: ...1 Pole 1N 1G Hs 40 kW hr at 17 4 mB H2O column 1434 xxx E Kxxx L P Gas Hs 40 kW 230 VAC 3 Amps 1 50 Hz 3 Wires 1 Pole 1N 1G Hs 40 kW hr at 27 4 mB H2O column 1440 xxx E Kxxx Nat Gas 35 kW 120 VAC 3 Am...

Страница 6: ...Impinger I Operator Manual 6 EXTERIOR DIMENSIONS...

Страница 7: ...t the claim must be initiated by the consignee ALL SHIPMENTS TO OTHER COUNTRIES Freight terms will be developed and extended on an individual basis Proper and secure storage facilities should be arran...

Страница 8: ...ck oven place the second oven on top of the first one Be sure that it sets on squarely and is fully seated The control panel goes on the right rear Now install oven top 4 Before installing the retaini...

Страница 9: ...ER DIRECTION Top fingers point down bottom fingers point up 11 Repeat step 10 until all eight 8 fingers are installed Install conveyor and crumb pans before operation See Conveyor Installation section...

Страница 10: ...should be contacted to provide guidance A properly engineered and installed ventilation hood and HVAC system will expedite approval and reduce oven maintenance costs Proper ventilation is the oven ow...

Страница 11: ...method of coloring the air may be used 1 Wear heat resistant gloves to prevent burns to your hands 2 Put the smoke candle in a cake pan approximately 8 inches 200 mm x 8 inches 200 mm x 2 inches 50 m...

Страница 12: ...closing its individual manual shut off valve during any pressure testing of the gas supply system at test pressures equal to or less than psig 3 45kPa IN MASSACHUSETTS The minimum length of a flexibl...

Страница 13: ...lifting eye B of cable assembly to hole A 2 Screw eye bolt C of cable assembly to stud in wall D or floor anchor E NOTE Installation point is the same for single and double stack oven s PROGRAMMING Q...

Страница 14: ...to 9 55 in 5 second increments 10 00 to 12 45 in 15 second increments 13 00 to 19 30 in 30 second increments 20 00 to 30 00 in 1 minute increments JUMPING BETWEEN MENUS Pressing the TIME push button...

Страница 15: ...the left side of the slot then rotate counterclockwise to the up position 4 Pull conveyor out the right end Place on table or work surface 1 Insert the conveyor through the opening in the right side...

Страница 16: ...nel to be sure that they are good before you call the Authorized Service Agency The name and phone number of the Authorized Service Agency should be located at the bottom of the data plate CLEANING IN...

Страница 17: ...r for correct positioning of flame target and sheet metal sides of the igniter assembly Inspect pilot orifice and clean Check igniter sensor for damage and aging Replace if necessary STACKING THE 1400...

Страница 18: ...TRANSFORMER DANGEROUS VOLTAGE EQUIPOTENTIALITY GROUND PROTECTIVE EARTH GROUND EARTH GROUND CHANGE FUSES FUSE POWER OFF POWER ON DISCONNECT POWER TEMPERATURE HEAT CONVEYOR FAN BURNER HEAT CYCLE READY...

Страница 19: ...NS CONT D AMPS VOLTS KILOWATTS HR TYPE OF GAS AC COOK TIME SERVICE ACCESSIBILITY PROVIDE MINIMUM REAR AND SIDE CLEARANCE ORIFICE MAIN ORIFICE LOW FIRE MODEL SERIES 1400 NOTE TO REVERSE DIRECTION OF CO...

Страница 20: ...associated therein null and void This includes any damage costs or legal actions resulting from the installation of any Lincoln commercial cooking equipment in a non commercial application or installa...

Страница 21: ...Impinger I Operator Manual 21 This page intentionally left blank...

Страница 22: ...Impinger I Operator Manual 22 This page intentionally left blank...

Страница 23: ...Impinger I Operator Manual 23 This page intentionally left blank...

Страница 24: ...Impinger I Operator Manual 24...

Отзывы: