1.3A-28001-B97
Owner Manual
Subject to change without notice
Page 10 of 16
LINCOLN GmbH • Postfach 1263 • D-69183 Walldorf • Tel +49 (6227) 33-0 • Fax +49 (6227) 33-259 • Tx 466088
Erection and Assembly of the EM-U2
• When installing the change-over valve, pay attention to the
mounting dimensions shown on Fig. 5
• The change-over valve can be installed in any position.
• Fix it to the housing feet by means of 4 screws M 10.
• Connect the tube lines in accordance with the instructions gi-
ven by the fitting manufacturer.
NOTE: Do not screw fittings with conical thread into the
connections of the change-over valve housing (refer to
Fig. 8 A)
Electrical Installation
• Perform the electrical connection of the change-over valve EM-
U2 according to Fig. 6
• All electrical work should be underta-
ken only by qualified personnel.
Mechanical Installation
Operating Instructions
Commissioning
• Put the change-over valve into operation in accordance with the
instructions mentioned in the description of the whole system.
• After the first pressure build-up in the main lines check the fit-
tings for leakage. Retighten them if necessary.