Linak CARELINE MJB Скачать руководство пользователя страница 7

7

Before installation, re-installation, or troubleshooting

• Stop the application
• Switch off the power supply and pull out the mains plug.
• Relieve the application of any loads, which may be released during the work.

Before start-up

• Make sure that the system has been installed as instructed in the User Manual.
• Make sure that the voltage of the control box is correct before the system is 
  connected to the mains.
• System connection. The individual parts must be connected before the control 
  box is connected to the mains. 

During operation

• Ensure that the cables are not damaged.
• Unplug the mains cable on mobile equipment before it is moved.

Information on the MJB

The MJB Modular Junction Box is designed for use together with OpenBus™ 
control boxes.
The MJB makes it possible to connect multiple handsets, attendant controls or it 
makes it possible to use the MJB as a control unit for 3

rd

 party products as Out of 

Bed detection, USB charger, Under Bed Light etc. 

LINAK A/S delivers only the OpenBus system and is not responsible for any 
products other than LINAK products (i.e. products from 3

rd

 party suppliers) or 

the compliance of such products with the LINAK OpenBus

TM

 system.

Содержание CARELINE MJB

Страница 1: ...To learn more about LINAK please visit W W W L I N A K C O M MJB Gateway U S E R M A N U A L...

Страница 2: ...2...

Страница 3: ...ormation on the MJB 7 Repairs 8 Misc on the MJB system 9 Warranty and service life 9 Maintenance 9 MJB GATEWAY variant 10 Standard functionality 10 Relay 1 and 2 10 Features 11 Options speciale articl...

Страница 4: ...r local dealer LINAK subsidiaries and some distributors situated all over the world have authorised service centres which are always ready to help you LINAK provides a warranty on all its products Thi...

Страница 5: ...y a person who is responsible for the safety of these persons Moreover children must be under surveillance to ensure that they do not play with the product It is important for everyone who is to conne...

Страница 6: ...y LINAK if necessary Warning The plastic parts in the system cannot tolerate cutting oil Warning LINAK s actuators and electronics are not constructed for use within the following fields Planes and ot...

Страница 7: ...box is connected to the mains During operation Ensure that the cables are not damaged Unplug the mains cable on mobile equipment before it is moved Information on the MJB The MJB Modular Junction Box...

Страница 8: ...bled as much as possible at the disposal and that you try to recycle it As an example of main groups within sorting of waste we can mention the following Metal plastic cable scrap combustible material...

Страница 9: ...rranty is only valid if the system is unopened and has been used correctly All LINAK products are designed to have an optimum service life as a matter of course but the expected service life in a spec...

Страница 10: ...connected to the mains closed loop The Closed Loop principal is to ensure that an alarm is sent if power is missing on the bed When the mains is disconnected power is missing the relay will go from N...

Страница 11: ...LINAK OpenBus Control Boxes light full Contact rating Max continuous current 1A Maximum switching voltage 125V DC 125V AC Maximum switching capacity 24W DC 62 5VA AC Contact resistance 100 m Current c...

Страница 12: ...B power mode Alarm level Relay state Mains unplugged or CB is in power down No Alarm NC On mains or battery at wake up Bed Alarm NO No Alarm NC When the mains is unplugged or CB is in power down will...

Страница 13: ...different products attached Before the final functional test in the production it is important that the system is re powered This is to ensure that all items have been detected on the OpenBus We recom...

Страница 14: ...14 Cable ordering nos Modular plug open end 0964140 3000 Please note the slit is placed on the opposite side of the modular plug This is to ensure that the cable is only being used for the Gateway MJB...

Страница 15: ...aracteristic numeral is specified ingress of solid foreign objects first characteristic numeral is not specified and therefore replaced by the letter X in the code The materials are resistant to the m...

Страница 16: ...ards from underneath the bed because it may enter the cable outlet Environmental conditions Environmental conditions Operating Temperature Relative humidity Atmospheric pressure 5 C to 40 C 20 to 90 3...

Страница 17: ...ected to all ports in the MJB both ports with narrow and wide slit Modular plug with narrow slit To be used with 3rd party products Can only be connected to ports in the MJB with narrow slit This is t...

Страница 18: ...er EN60529 Class 2 equipment For indoor use Double insulated transformer Protective earth Alternating Current Direct current Attention consult accompanying documents Key to symbols Lock function Relea...

Страница 19: ...approval T v Produkt Service T VRheinland ETL C ETL LGA UL Listing Mark C UL Listing Mark C UL US Listing Mark UL Listing Mark UL file number UL file number UL file number CSA PSE Mark Product with a...

Страница 20: ...20 MJB MJB Modular Junction Box DRAWING APPENDIX MJB...

Страница 21: ...ted as each individual application is unique The suitability and functionality of the LINAK product and its performance under varying conditions application vibration load humidity temperature frequen...

Страница 22: ...22...

Страница 23: ...23...

Страница 24: ...4 0 121 544 2211 Fax 44 0 121 544 2552 E mail sales linak co uk www linak co uk ITALY LINAK ITALIA S r l Phone 39 02 48 46 33 66 Fax 39 02 48 46 82 52 E mail info linak it www linak it JAPAN LINAK K K...

Отзывы: