www.lih.de
S.
3/3
N = neutral cable blue
grounding cable yellow green
Run the supply cable through the cable bushing into the case providing needed
length. Lock the cable inside the case with two bolts using the clamp (strain relief).
Connect cable cores using cable clamps. Screw ring tight to the cable bushing. Strip
cable ends as shown in figure 2.
Fig. 2
Each cable must be connected to the connector block and locked safely.
When all cables are connected, make sure that there is no bare copper protruding out
of the clamps.
WARNING!
Never touch hot screen with bare fingers!
Never spray cold water on the protective screen while it is still hot, as this will
cause damage to the screen!
Always switch off UV Master Junior and allow it to cool off before cleaning!
LIH Light Impex Henze GmbH
Bgm.-Schwaiger-Straße 43
D-85567 Grafing bei München
Tel.:+49/(0)8092 709957
Fax:+49/(0)8092 709958
-
www.lih.de