background image

 

 

 

 

www.lih.de

 S. 

3/3 

N  =  neutral cable blue 

grounding cable yellow green 

 

  Run the supply cable through the cable bushing into the case providing needed 

length. Lock the cable inside the case with two bolts using the clamp (strain relief). 
Connect cable cores using cable clamps. Screw ring tight to the cable bushing. Strip 
cable ends as shown in figure 2. 

 

Fig. 2 

 

 

  Each cable must be connected to the connector block and locked safely. 

  When all cables are connected, make sure that there is no bare copper protruding out 

of the clamps. 
 

 

WARNING! 

Never touch hot screen with bare fingers! 
Never spray cold water on the protective screen while it is still hot, as this will 
cause damage to the screen! 
Always switch off UV Master Junior and allow it to cool off before cleaning! 

 
 

 

LIH Light Impex Henze GmbH 
Bgm.-Schwaiger-Straße 43 
D-85567 Grafing bei München 
Tel.:+49/(0)8092 709957 
Fax:+49/(0)8092 709958 

[email protected]

  

-  

www.lih.de

 

 

Отзывы: