INSTRUCTION SHEET NO.
IS:1100F
D0605
PAGE 2 OF 2
READ AND UNDERSTAND THESE INSTRUCTIONS BEFORE INSTALLING FIXTURE.
This fixture is intended for installation in accordance with the National Electrical Code and local or Federal
code specifications. To assure full compliance with codes and regulations, check with your local electrical
inspector before installation. To prevent electrical shock, turn off electricity at fuse box before proceeding.
Retain these instructions for maintenance reference.
®
MOUNTING FRAME
BRIDGE
SLOT
Fig. H
ROTO CLIP
STAPLE
MOUNTING FRAME
CEILING MATERIAL
Fig. I
FRAME
J-BOX COVER
J-BOX
J-BOX SPRING
J-BOX COVER
Fig. J
BALLAST REPLACEMENT (FIG. J)
NOTE:
Ballast replacement must be provided by a “qualified electrician”.
1. TURN OFF POWER.
2. Remove reflector trim from FRAME-IN KIT.
3. Remove J-BOX COVER nearest ceiling opening by lifting SPRING.
4. Disconnect all input wiring to ballast.
5. Remove BALLAST ASSEMBLY from J-BOX by pulling SPRING upward
(Fig. J).
6. Remove BALLAST ASSEMBLY through ceiling opening.
7. Release all wires from BALLAST WIRE CONNECTORS by inserting small
blade tool, with insulated handle, into WIRE RELEASE SLOTS. (Fig K).
NOTE:
Replacement ballast kits generally are supplied with this special
wire release tool.
8. Remove (2) NUTS which hold BALLAST to J-BOX COVER.
9. Replace old BALLAST with new BALLAST and attach with NUTS
to J-BOX COVER.
10. Reassemble new BALLAST ASSEMBLY to J-BOX by snapping
onto J-BOX spring (Fig. J).
11. Rewire fixture. See WIRING DIAGRAM on BALLAST LABEL.
EXISTING CONSTRUCTION
Fig. A
1. Cut-Opening
Fig. B
2. Wire-in
Fig. C
3. Put Through
Fig. D
4. Anchor
Fig. F
6. Push-up
Fig. E
5. Snap-on
LIGHTOLIER a GENLYTE company.
631 Airport Road, Fall River, MA 02720
REMO
VE
INSERT
BALLAST WIRE
CONNECTORS
WIRE RELEASE
BLADE
(BY OTHERS)
WIRE RELEASE
SLOTS
1.
CUT OPENING (FIG. A AND FIG H)
a. Remove ADJUSTABLE MOUNTING BARS.
b. Use MOUNTING FRAME opening as template.
c. Break off BRIDGE on MOUNTING FRAME as shown in
Fig. H by breaking WEBS on SLOTS with cutting plier.
2.
WIRE-IN (FIG. B)
For cable, use built in Cable Clamp in J-BOX. Connect white fixture
lead to neutral (white) supply lead. Black fixture leads to hot (black)
supply lead. Bare copper and/or green insulated wire(s) must all be
connected to supply ground. Use wire nuts (local hardware items).
Place all electrical connections in the
J-BOX. Attach J-BOX COVER onto J-BOX.
3.
PUT THROUGH (FIG. C AND FIG. J)
Detach BALLAST ASSEMBLY from J-BOX and pass MOUNTING
FRAME into ceiling as shown in Fig. C. Reattach BALLAST ASSEMBLY.
4.
ANCHOR (FIG. D AND FIG. I)
Using STAPLE (order separately Cat. #1985S), slide long end under-
neath raised embossing and short leg into ceiling (Fig. I).
5. SNAP-ON (FIG. E)
See separate instruction sheet
6. PUSH-UP (FIG. F)
for your choice of reflector trim.