background image

"JSQPSU3PBE'BMM3JWFS."t t'BY 

We reserve the right to change details of design, materials and finish.

XXXMJHIUPMJFSDPN½1IJMJQT(SPVQt

Lighting Systems 

IS-A1 

1BHFPG

*OTUSVDUJPO4IFFUGPS"TTFNCMZBOE*OTUBMMBUJPOPG"MFSPO4FSJFT

#

3&"%"/%6/%&345"/%5)&4&*/4536$5*0/4#&'03&130$&&%*/(

RETAIN THESE INSTRUCTIONS FOR MAINTENANCE REFERENCE.

5IJTmYUVSFJTJOUFOEFEGPSJOTUBMMBUJPOJOBDDPSEBODFXJUIUIF/BUJPOBM&MFDUSJDBM$PEFBOEMPDBMSFHVMBUJPOT
5PBTTVSFGVMMDPNQMJBODFXJUIMPDBMDPEFTBOESFHVMBUJPOTDIFDLXJUIZPVSMPDBMFMFDUSJDBMJOTQFDUPSCFGPSF
JOTUBMMBUJPO5PQSFWFOUFMFDUSJDBMTIPDLUVSOPGGFMFDUSJDJUZBUFMFDUSJDBMQBOFMCFGPSFQSPDFFEJOH

%0/05*/45"--5)*44:45&.*/"8&503%".1-0$"5*0/
%0/05&/&3(*;&"/:5)*/(05)&35)"/5)&'*9563&4*/5)&4:45&.
%0/05&9$&&%."9*.6.8&*()5-0"%*/(
%0/0516--.03&5)"/".141&3(108&3%301

$0/53"$503*43&410/4*#-&'03"%&26"5&-:3&*/'03$*/($&*-*/(504611035'*9563&8&*()5

HBV5NBYMPBEBNQT 4UBOEBSE
HBV5NBYMPBEBNQT

Track

Perf-Pierced-Solid

Perf-Pierced-Solid

Non-Track

Содержание Lighting Systems IS-A1

Страница 1: ...DPSEBODF XJUI UIF BUJPOBM MFDUSJDBM PEF BOE MPDBM SFHVMBUJPOT 5P BTTVSF GVMM DPNQMJBODF XJUI MPDBM DPEFT BOE SFHVMBUJPOT DIFDL XJUI ZPVS MPDBM FMFDUSJDBM JOTQFDUPS CFGPSF JOTUBMMBUJPO 5P QSFWFOU FMFDU...

Страница 2: ...serve the right to change details of design materials and finish XXX MJHIUPMJFS DPN 1IJMJQT SPVQ t Lighting Systems IS A1 1BHF PG OTUSVDUJPO 4IFFU GPS TTFNCMZ BOE OTUBMMBUJPO PG MFSPO 4FSJFT 4 48 144...

Страница 3: ...SNFEJBUF TVTQFOTJPO BTTFNCMJFT UP UIF DFJMJOH TUSVDUVSF TVQQPSU C U UIF FOE PG FBDI SVO JOTUBMM UIF OPO QPXFS GFFE FOE TFU D Installing the First Fixture Step 2 POOFDU XJSJOH CFGPSF TMJEJOH UIF QPXFS...

Страница 4: ...FBDI BEEJUJPO UP ZPVS SVO UJHIUFO EPXO UIF TFU TDSFXT UP IPME UIF mYUVSFT JO QMBDF JH B G JOTUBMMJOH USBDL mYUVSFT DPOOFDU XJSJOH BOE TMJEF UIF USBDL DPVQMFS JOUP UIF USBDL PG UIF JOUFSNFEJBUF mYUVSF...

Страница 5: ...WFS t t BY We reserve the right to change details of design materials and finish XXX MJHIUPMJFS DPN 1IJMJQT SPVQ t Lighting Systems IS A1 1BHF PG OTUSVDUJPO 4IFFU GPS TTFNCMZ BOE OTUBMMBUJPO PG MFSPO...

Страница 6: ...DBQ nVTI UPHFUIFS B Tighten set screws on the end cap C Figure 6 Figure 7 Figure 8 A B C Locating the Track Head Step 2 PDBUF XIFSF ZPV XPVME MJLF UIF USBDL IFBE T UP CF NPVOUFE 4OBQ JO UIF USBDL IFB...

Страница 7: ...Cover Step 3 GUFS DVUUJOH UP MFOHUI ZPV OFFE UP TMJEF UIF USBDL TQSJOHT JOUP QMBDF PO UIF USBDL DPWFS PUF BDI TFDUJPO PG A USBDL DPWFS TIPVME SFDFJWF UXP TQSJOHT YDFQU JO UIF DBTF PG BO h TFDUJPO U TI...

Страница 8: ...FS t t BY We reserve the right to change details of design materials and finish XXX MJHIUPMJFS DPN 1IJMJQT SPVQ t Lighting Systems IS A1 1BHF PG OTUSVDUJPO 4IFFU GPS TTFNCMZ BOE OTUBMMBUJPO PG MFSPO 4...

Страница 9: ...sembly Step 1 TTFNCMF UIF MFOT CSBDLFU PO BMM GPVS DPSOFST PG UIF MFOT BT TIPXO JH A 4MJEF DBTUJOH CSBDLFUT POUP UIF MFOT CSBDLFU PO CPUI FOET PG UIF MFOT 5JHIUFO EPXO UIF GPVS TFU TDSFXT JH B Figure...

Страница 10: ...U PWFS DBCMF JH A 4DSFX EPXO DBCMF CBMBODF TMFFWF POUP UIF CVMMFU JH B 4MJEF DBCMF CBMBODJOH BTTFNCMZ UP UIF IJHIFTU QPJOU PG UIF MFOT BOE UJHIUFO TFU TDSFXT JH P OPU PWFS C tighten Installing an Inte...

Отзывы: