"JSQPSU3PBE'BMM3JWFS."t t'BY
We reserve the right to change details of design, materials and finish.
XXXMJHIUPMJFSDPN½1IJMJQT(SPVQt
Lighting Systems
IS-CTS3_GRID
1BHFPG
*OTUSVDUJPO4IFFUGPS"TTFNCMZBOE*OTUBMMBUJPOPG$54(SJE'JYUVSFT
#
Drop Fixture in 4” on
Center T Grid Opening.
And Hang Fixture fro
m
Structure Above. Make
Sure Fixture is Leveled
Lengthwise and Width-
wise.
3”
Figure 1
Secure to Grid Using
Provided Clips. Provide
Power to Fixture Through
Access Plate and Test.
Clip
3”
Figure 2
Install Diffuser Provided
with Fixture. Lens or
Louver
3”
Figure 3
Individual Installation
A.
1MBDFmYUVSFJOEFTJSFEMPDBUJPOBOETVQQPSUCPUIFOETXJUIIBOHXJSFTGSPNTUSVDUVSFBCPWF"MTPTFDVSFCPUI
1.
TJEFTXJUIHSJEMPDLJOHDMJQT
3FNPWFBDDFTTQMBUFPOUPQPGmYUVSFUPHBJOBDDFTTUPTQMJDFDPNQBSUNFOUSFNPWFBw,0GSPNBDDFTT
2.
QMBUFBOEQVMMOFDFTTBSZXJSFTPVUPGmYUVSF
1SPWJEFQPXFSUPmYUVSFQFS/&$MPDBMDPEFTBOESFJOTUBMMBDDFTTQMBUF
3.
-BNQBMMmYUVSFTXJUIEFTJHOBUFEMBNQTBOEUFTU
*OTUBMMBMMEJGGVTFSTQSPWJEFEXJUImYUVSFT