Figure 32.
Important Recommendations:
• The guying angle must be no greater than 60° from horizontal.
• The inline coupling couples the upper and lower mast sections
and provides guying points and an exit point for the HVSC
downconductor.
• Minimum of 3 guying grips per guy end.
• Guying grips spaced at a minimum of 30mm (1 in.).
• Grips are correctly orientated –saddle on the longer length side of
the guy and U-bolt over the tail side of the guy.
• Tighten grips to no more than 60cN.m (5Ibf.in) of torque.
• Customised guy kits can be supplied upon request.
• With the upper termination of the HVSC completed and the FRP mast
in position it is now time to finalise the mounting arrangement so
that the mast can be raised and secured into position.
• If using the recommended installation methods as per drawings
GA-1, SM-1, SW – 1 & ST-1 fit the inline coupling to the lower mast
material.
Preparation
and Raising of
the Mast into
Position
Содержание Stormaster ESE
Страница 10: ...8 Figure 2...
Страница 11: ...9 Figure 3...
Страница 12: ...10 Figure 4...
Страница 13: ...11 Figure 5...
Страница 14: ...12 Figure 6...
Страница 15: ...13 Figure 7...
Страница 25: ...23 Figure 13 Figure 14...