© 2020 HealthE Lighting All Rights Reserved
CLEANSE® PORTAL
Installation - Overall Assembly
Step 1: Unpack all the components
Step 2: Set the two Side V Frame Assemblies up
with 35.5” distance (as shown in the drawing)
Step 3: Set the Top V Assembly (shown as
Item 1
in the drawing) on the top of the Side V Frame
Assembly (shown as
Item 2
in the drawing)
Step 4: Make all the electric connections
through quick connectors (please see the next
page for additional details)
Step 5: Fasten Top V Frame Assembly and Side V
Frame Assemblies with ¼”
-
20 x ¾” SH Screws
(shown as
Item 5
in the diagram)
Step 6: Fasten Close-out Plate Assembly with
#6-
32 x ½” FH Screws (shown as
Item 3
and
Item
4
in the diagram)
Note: there is no polarity requirement of Close-out Plate
installation.
35.5”
2