9.)
Turn the bottle around to the back, then ensure all cables inside the bottle
are laid away from the brown plates except for the two cables shown below. Laythese two cables in between the brown plates.
Страница 1: ...guide To ensure a trouble free installation of your light kit please read and follow each step carefully These instructions can be downloaded in PDF format here Please note This page lists instruction...
Страница 2: ...oard 2x 5cm Connecting Cables 1x AA Battery Pack 6x Adhesive Squares Important things to note Laying cables in between and underneath bricks Cables can fit in between and underneath LEGO bricks plates...
Страница 3: ...ted only one way With the expansion board facing up look for the soldered symbol on the left side of the port The connector side with the wires exposed should be facing toward the soldered symbol as y...
Страница 4: ...f the connector with the wires exposed is facing down If a plug won t fit easily into a port connector don t force it Doing so will damage the plug and the connector Installing Bit Lights under LEGO b...
Страница 5: ...OK Let s Begin 1 First remove the bottle from the stand and disconnect the bottle top as well as top window sections to allow us to remove the ship...
Страница 6: ...2 Remove the three masts from the ship then disconnect the following sections around the front...
Страница 7: ...the ship Thread it all the way through until the Bit Light is up against the edge of the gap Ensure the LED is facing up then lay the cable down the side of the ship as shown below Secure it in place...
Страница 8: ...30cm Bit Light and slightly bend the wire down about 1cm from the top of the Bit Light as shown below Hook the bit light over the following stud then secure it in place by reconnecting the brown gril...
Страница 9: ...e cable down in between studs then reconnect the side brown wall tile Repeat this process to install another White 30cm Bit Light to the left securing it in place by reconnecting the brown tile over t...
Страница 10: ...1 6 plate as shown below You may need to slightly lift up the two bit lights to reconnect the plate back in place Reconnect the brown wall tile by sliding it in and connecting it underneath then recon...
Страница 11: ...top to lock them in place 6 Take the AA Battery Pack and insert 3x AA Batteries to it Connect the battery pack cable to the first port on the 6 Port Expansion Board Connect the three cables from the s...
Страница 12: ...with the light or expansion board To correct any issues with expansion board ports please view the section addressing expansion board issues on our online troubleshooting guide Disconnect the three bi...
Страница 13: ...hen take out a Blue 30cm Bit Light and place it directly over one of studs Secure the Bit Light in place by reconnecting the other trans light blue round plate over the top as shown below Repeat this...
Страница 14: ...from inside the bottle to secure them in place Take the 8 Port Expansion Board and connect the AA Battery Pack to it then connect all six Blue Bit Light cables Turn ON the battery pack to test all th...
Страница 15: ...rd To correct any issues with expansion board ports please view the section addressing expansion board issues on our online troubleshooting guide 8 Tip all the trans light blue round plates out of the...
Страница 16: ...tle Pull the cable all the way out from behind We will now install the remaining five Blue Bit Lights around the base of the bottle Using the same method as above mount the other five trans light blue...
Страница 17: ...we did for the first Blue Bit Light...
Страница 18: ...9 Turn the bottle around to the back then ensure all cables inside the bottle are laid away from the brown plates except for the two cables shown below Lay these two cables in between the brown plates...
Страница 19: ...wind the six cables around each other all the way to the ends so they come together to form one larger cable then starting with the shorter two cables connect all six cables to the 8 Port Expansion B...
Страница 20: ...and twist wind them around the larger cable so they group together 10 Pour back in all of the trans light blue round plates into the bottle Spread the pieces out evenly to try and cover the cables ins...
Страница 21: ...e ship and thread the group of three cables through the gap on the left of the blue bit light cables Pull the cables all the way out from behind to then allow you to reconnect the ship back inside the...
Страница 22: ...11 Reconnect all the trans clear sections which make up main section of the bottle...
Страница 23: ...2 Take a White 30cm Bit Light and with the cable facing down place it over the centre of the studs on top of the main bottle section Secure the Bit Light in place by reconnecting the bottle top sectio...
Страница 24: ...Bring the other end of the cable across to the right then twist wind it around the group of white 30cm bit lights on the right side Connect the bit light to the next port on the 6 Port Expansion Board...
Страница 25: ...he larger group of cables as shown below 13 Take a Multi Effects Board and connect a 5cm Connecting Cable into one of the OUT ports side with two ports Connect the other end of the 5cm Connecting Cabl...
Страница 26: ...ble and connect it to the IN port on the Multi Effects Board side with one port Connect the other end of the 5cm Connecting Cable to a spare port on the 6 Port Expansion Board then connect the AA Batt...
Страница 27: ...fect and speed you desire by simply changing the channel switch and adjusting the speed wheel Once you are happy with your desired effect place the bottle back on top of the bottle stand with the back...
Страница 28: ...This finally completes installation of the Light My Bricks Ship in a Bottle Light Kit We thank you for purchasing this product...