18
TOOLS AND HARDWARE REQUIRED FOR THIS PAGE
ALE
16”
.BLFBNBSLJODIFTGSPNUIFEJNQMFEFOEPGUIF
Bottom Pole (ALE)
EPOPUTDSBUDIUIFQPXEFSDPBUJOH4MJEFUIF
Alignment Frame (BGW)
PWFSUIF#PUUPN1PMF
SEC
1.2
Playing
Surface
ALE
TOP VIEW
BGW
4MJEFUIFEJNQMFEFOEPGUIF
Bottom Pole (ALE)
JOUPUIFDFNFOUVQUP
UIFJODINBSL1PTJUJPOUIFQPMFOFYUUPUIFQMBZJOHTVSGBDF'PS
SFHVMBUJPODPVSUTUIF
Alignment Frame (BGW)
TIPVMEDSPTTUIFQMBZJOH
TVSGBDFBUUIFNJEEMFPGUIFTDPSFENFBTVSFNFOUT
SEC
1.3
ALE
BGW
Note: Use a Level to make sure the Bottom Pole is standing vertical. Form
the cement into a downward slope away from the pole to allow water runoff.
Failure to do so may result in premature rusting of the Pole.
!
NO TOOLS OR HARDWARE REQUIRED FOR THIS PAGE