19
TOOLS AND HARDWARE REQUIRED FOR THIS PAGE
.JYUIFSFNBJOJOHCBHPGDPODSFUF'JMMUIF
Bottom Pole (ALE)
XJUI
DPODSFUFVOUJMJUKVTUCFMPXUIFTMPUTOFBSUIFUPQPGUIFQPMF%POPU
PWFSmMM5BNQUIFDPODSFUFEPXOJOUIF#PUUPN1PMFXJUIBCSPPN
IBOEMFUPSFNPWFBJSQPDLFUT$MFBOBMMDPODSFUFPGGUIFPVUTJEFPG
UIFQPMF
Allow the concrete to set for at least 72 hours before installing the rest
of the system onto the Bottom Pole.
SEC
1.6
Cement Level
Inside Pole
Rebar
Note: STOP HERE! The concrete must cure for at least 72 hours (3 days) before
installing the rest of the system. In humid climates or wet weather, allow additional
time for the concrete to cure. Do not proceed until the curing process is complete.
!
NO HARDWARE REQUIRED FOR THIS PAGE