17
Required For
This Page:
5
/” Wrenches
HH0800C
6
PI
PE
PE
PA
PA
Insert the Coupler (PI)
into the end of the Outer
Sleeve (AV).
Tighten the Bolts (PE) (with the
nylon patch) through the Backboard
Brackets and into the Coupler (PI).
PI
AV
Tighten the Nuts (PE) securely.
PC
PI
Insert the Bolt (PC) through
the Coupler (PI) and into the
Spring assembly.
Tightening this Bolt (PC)
will adjust the Rim tension.
PC
PE
(1)
()
PA
()
PI
(1)
1/” Wrenches
(Not actual size)
Remove the plastic film from
the Backboard.
Loosen the Bolts (RD) from Step 16
for the next few steps. Retighten them
before Step 28.