
15
Step 5. Basin Cabinet Placement to Tower Cabinet
1) Take basin cabinet and unroll the 2 electrical cords located to the right of the basin pipe
connection (See Figure 5.1).
2)
Slide basin cabinet into place in between back wall and front of tower cabinet just enough to
send the 2 electrical cords into tower cabinet rectangular opening (to plug into each of their
respective tower large junction box outlets later) (See Figure 5.2).
3) Align basin cabinet drain fitting to tower cabinet front opening and slide the two cabinets
together until they are snug (See Figure 5.3), making sure that round male threads from
basin drain go into round tower cabinet opening.
Figure 5.1 Figure 5.2
Basin Light
Cord (green)
Remote Switch Cord
(round connection)
Power Cord
Содержание 120G5
Страница 4: ......
Страница 20: ...16 Figure 5 3 Basin Tower...