19
TORQUE II
4.7. User Defined Programs
There are three user defined programs U1, U2, U3
1. User defined program set up
Press “PROGRAM” continuously in standby mode until window displays U1-U3. Press “MODE” to start
setting first segment, setup speed and incline by pressing “SPEED+” “SPEED-” AND “”
“INCLINE-”. Press “MODE” to finish first segment setting and to begin segment. Repeat this until all 10
segments have been completed. The data will be permanently saved until it is overwritten via this process.
2. Starting the user defined program
a. Press the “PROG” button whilst in standby mode until the window displays U01-U03,
press START after setting the running desired running time for this program.
b. Alternatively you may press the START button immediately after you have finishing
setting up the user define program
3. Instruction of user define program setting
Each program is divided into 10 segments. The machine can only be started when all the speed and incline
are finish set for each segment.
Содержание TORQUE II
Страница 11: ...11 TORQUE II 6 OPERATION GUIDE 1 OVERVIEW...
Страница 31: ...31 TORQUE II 9 EXPLODED DIAGRAM...