29
STEP 9-1
A. Thread the Cable (32) through the Upright Tube (6). Slot the Pulley (46) into the Upright
Tube (6) and pull the Cable (32) through over the Pulley (46). Then secure the Pulley
(46) into the Upright Tube (6) with one Hexagon Head Bolt (75) and one Nylon Nut (85).
Tighten bolt and nylon nut with one 14 mm-17 mm Double Open End Wrench and one
17 mm-19 mm Double Open End Wrench provided.
B. Pull the Cable (32) downwards to the Double Pulley Bracket (22). Slot the Pulley (46) in
the Double Pulley Bracket (22) and pull the Cable (32) through underneath the Pulley
(46). Then secure the Pulley (46) in the Double Pulley Bracket (22) with one Hexagon
Head Bolt (76), one Nylon Nut (85), and two Flat Washers (87). Tighten bolt and nylon
nut with one 14 mm-17 mm Double Open End Wrench and one 17 mm-19 mm Double
Open End Wrench provided.
C. Pull the Cable (32) upwards to the Double Floating Pulley Brackets (21). Slot the
Pulley (46) in the Double Floating Pulley Brackets (21) and pull the Cable (32) through
over the Pulley (46). Then secure the Pulley (46) in the Double Floating Pulley
Brackets (21) with one Hexagon Head Bolt (76), one Nylon Nut (85), and two Flat
Washers (87). Tighten bolt and nylon nut with one 14 mm-17 mm Double Open End
Wrench and one 17 mm-19 mm Double Open End Wrench provided.
14 mm-17 mm
17 mm-19 mm
14 mm-17 mm
17 mm-19 mm
17 mm-19 mm