12
Step 3
Install each Weight Stack (42) onto the Weight Stack Sliding Rods (5).
NOTE: Ensure that each weight stack’s
selector pin slot faces downward.
Slide the Plastic Bushing (41) onto the Guide Rod (43) and align pin hole. Secure the
Plastic Bushing (41) onto the Guide Rod (43) by inserting the Pin (40) through into the holes
of the Guide Rod (43) and Plastic Bushing (41).
Slide the Top Weight Stack (38) onto the Guide Rod (43) and Plastic Bushing (41). Place
the Top Weight Stack Washer (39) onto the hole of the Top Weight Stack (38).
Finally, install the Top Weight Stack (38) with Guide Rod (43) onto the Weight Stack Sliding
Rods (5).
Weight Stack Pack:
Hardware: Plastic Part:
40
42
41
43
39
36
38
42
1 Top Weight Stack
(Approximately 4.5kgs/10lbs)
9 Weight Stacks
(Approximately 40.5kgs/90lbs)
1 Plastic Bushing
1 Pin
1 Top Weight Stack Washer
Содержание 63130
Страница 4: ...3 PARTS NUMBERS AND ILLUSTRATIONS ...
Страница 22: ...21 CABLE LOOP DIAGRAM ...