background image

3

MAKE UP HEAT REQUIREMENT at 1200 CFM (566L/s)

Nominal

Nominal

Nominal

Outdoor Temp.

kW Req. for

kW Req. for

kW Req. for

20°C (68°F)

25°C (77°F)

30°C (86°F)

Air Delivery

Air Delivery

Air Delivery

0        32

7

10

14

-10        14

10

14

17

-20        -4

12

15

19

-30       -22

15

19

22

-40       -40

17

21

24

Selecting the Correct Size HRV

Commercial and Institutional Requirements

For outdoor air requirements,  ASHRAE has produced the Ventilation Standard 62-1989 
that is used to determine acceptable ventilation rates. This standard is referenced directly or
used as “Good Engineering Practice” in most Code documents or design criteria.

Small restaurants, Donut Shops and Fast food stores

Seats

40

Employees

5

Total

45

ASHRAE requirement

20 cfm (10 L/s) per person

Ventilation required

45 x 20  = 900 cfm (450 L/s)

Bank

Customers

25

Staff

9

Total

34

ASHRAE requirement

20 cfm (10 L/s) per person

Ventilation required

34 x 20  = 680 cfm (320 L/s)

Bar or Tavern

Seats

50

Employees

7

Total

57

ASHRAE requirement

30 cfm (15 L/s) per person

Ventilation required

57 x 30  = 1710 cfm (855 L/s)

Bingo Hall

Customers

180

Staff

20

Total

200

ASHRAE requirement

30 cfm (15 L/s) per person

Ventilation required

200 x 30  = 6000 cfm (3000 L/s)

Classroom and School Portables

Seats

29

Teacher

1

Total

30

ASHRAE requirement

15 cfm (7.5 L/s) per person

Ventilation required

30 x 15  = 450 cfm (255 L/s)

Print Shop, Duplicating

Square footage of shop

2000 square ft

ASHRAE requirement

0.5 cfm / ft

2

(2.5 L/s - m

2

Ventilation required

2000 x 0.5  = 1000 cfm (500 L/s)

Beauty Salon

Customers

12

Employees

6

Total

18

ASHRAE requirement

25 cfm (12.5 L/s) per person

Ventilation required

18 x 25  = 450 cfm (255 L/s)

Swimming Pools

Refer to “Pool” Models Installation Manuals.

Содержание 2500EFD

Страница 1: ...nstallation the compatibility of the two pieces of equipment must be confirmed by measuring the airflow s of the Heat Recovery Ventilator HRV Energy Recovery Ventilator ERV by using the balancing proc...

Страница 2: ...will help in cooling the incoming fresh air with the stale air that is being exhausted Table of Contents Introduction 2 Select Correct HRV 3 Specifications Model 2500IFD 4 Specifications Model 2500EF...

Страница 3: ...required 45 x 20 900 cfm 450 L s Bank Customers 25 Staff 9 Total 34 ASHRAE requirement 20 cfm 10 L s per person Ventilation required 34 x 20 680 cfm 320 L s Bar or Tavern Seats 50 Employees 7 Total 5...

Страница 4: ...n each air stream DUCT CONNECTIONS Four 24 X 16 610mm X 406mm CABINET 20 gauge powder coated galvanized steel G60 for superior corrosion resistance 16 gauge galvanized frame insulated with1 5 fibregla...

Страница 5: ...ar aluminum sensible heat recovery core Plate to plate type Slides out of either side of cabinet for service MOTORS Two single shaft PSC 3 speed 208 230V 5 1 amps 1 ph 1 hp BLOWERS Two direct drive ce...

Страница 6: ...ANK TIMER Mechanical timer to activate high speed 99 116 DEHUMIDISTAT VENTILATION CONTROL DVC Turns unit on off via slider switch and high low via built in dehumidistat 99 130 DEHUMIDISTAT Activates h...

Страница 7: ...used to control the unit see pg 9 Installation Tips 1 Whichever method is chosen to operate the 2500 keep in mind that Air to Air exchangers in general are not booster fans and are normally sized to v...

Страница 8: ...humidity level exceeds selected setting PART NO 99 130 CRANK TIMER Provides high speed ventilation as required Crank Timer 60 minute PART NO 99 101 ON OFF HIGH LOW COMMON I I I I I I I I I I I I I I I...

Страница 9: ...e where the surrounding air temperature does not fall below freezing point The exhaust air temperature must be above 60 F 16 C for proper defrost operation If the air temperature is too low the defros...

Страница 10: ...n and slope of drain lines Vibration isolators May be anchored to floor leaving space for drain connections 2500IFD Saddle mount not provided Hang unit with threaded rods and U channel members 2 X 4 u...

Страница 11: ...RAME To ensure proper mating with unit it is critical that mounting frame be squared to the roof as follows 1 With frame situated level in desired location on roof trusses tack weld one corner of fram...

Страница 12: ...elsewhere and provided by the contractor The 2500EFD has built in screens to prevent foreign objects from entering into the ductwork through the out side hoods NOTE It is extremely important to desig...

Страница 13: ...grilles should be located high on the wall If contaminants are heavier than air a lower placement of the grilles will be required Information on a contaminants specific gravity and toxicity should be...

Страница 14: ...wnstream of any elbows or bends and one foot upstream of any elbows or bends These are recommended distances but the actual installation may limit the amount of straight duct The Pitot tube should be...

Страница 15: ...d the HRV Electrical Connections System is 208 230V 1 phase 60 Hz This unit meets all local codes and requirements It is STRONGLY recommended that an electrical disconnect be installed prior to the HR...

Страница 16: ...UNIT Check design static pressure of air handler to ensure it is compatible with HRV B A ROOFTOP HEAT COOL UNIT SUPPLY DUCTWORK CEILING RETURN AIR PLENUM ROOF DECK STALE AIR EXHAUST HRV FRESH AIR SUP...

Страница 17: ...LOW TIMER ON OFF ON OFF 24V F1 XFRM1 240V 240 VAC 15 AMPS COMMON 24 VAC 24 VAC TI 109 07 97 5 AMP COMMON HIGH LOW HIGH LOW SNAP DISK C3 HIGH BLACK HIGH YELLOW COM BLUE MID RED LOW EXHAUST MOTOR EXHAU...

Страница 18: ...5A 5A ON OFF HIGH LOW SNAP DISK TM1 1 R2 1 R1 1 R3 1 R4 1 R3 1 R3 1 R3 1 Blk High Red Low Blk High Red Low Yel Com Yel Com Yel Com Yel Com XFMRI SM SM EM EM Exhaust Motor SM Supply Motor EM R2 R3 R1 R...

Страница 19: ...d London Ontario N5W 4C8 519 457 1904 or fax 519 457 1676 to find the name of your nearest dealer in order to repair the product The labour required to install any replacement part s shall be dealt wi...

Страница 20: ......

Отзывы: