
11
3. Left/Right Handrail Arms, Left/Right Foot Bars, Left/Right Foot Pedals, and Foot
Bar Covers-A/B Installation
Remove two M8x18 Bolts (43), two Ø18xØ10.5x3 Spring Washers (44), two Ø10xØ20x1.5
Big Washers (52), and two Ø28x5 Washers (46) from the left and right horizontal axles of
the Front Post (5). Remove bolts and washers with the Multi Hex Tool provided.
Attach the Left Handrail Arm (3L) onto the left horizontal axle of the Front Post (5) with one
M8x18 Bolt (43), one Ø18xØ10.5x3 Spring Washer (44), one Ø10xØ20x1.5 Big Washer (52),
and one Ø28x5 Washer (46) that were removed. Tighten bolts and washers with the Multi
Hex Tool provided. Install a S16 Cap (49) onto the M8x18 Bolt (43).
Multi Hex Tool
Allen Wrench S8
Multi Hex Tool with Phillips Screwdriver
S10, S13, S14, S15
27
28
29
29
27
28
31
31
16R
17R
18
20
16L
17L
18
20
4943
44
46
49
43
44
46
2L
3R
3L
36
37
2R
5
51
93L
93R
93L
93R
52
52
79
1
67
60
60
60
60
Tool: