Initial Startup and Electrical Checks
19
Figure 7
Hardwire terminal connections
7.2
Output Receptacle Distribution Options
1. Verify that the input feeder circuit breaker is off.
2. Verify that the input and output circuit breakers are off.
3. Verify the UPS is completely OFF.
4. Remove the four screws holding the blank access plate from the rear of the UPS.
5. Connect the four-position Anderson connector of the PD distribution into the mating connector
inside the UPS.
6. Using the same four screws, attach the PD distribution option to the rear of the UPS.
7. Verify all distribution circuit breakers are in the ON position.
8. Follow the initial startup procedures listed in
7.0 - Initial Startup and Electrical Checks
.
!
WARNING
A qualified electrician should install the optional output distribution.
INPUT
L1
N
L2
N
L1
L2
OUTPUT
Содержание GXT2-10000RT208
Страница 1: ...AC Power For Business Critical Continuity Liebert GXT2 10000RT208 User Manual 10kVA 60 Hz 120 208 240V...
Страница 2: ......
Страница 55: ......