GR20 Quick Disconnect Assembly

 

 

GR20 Assembly

 

The GR20 quick disconnect assembly provided with your grinder package system is designed to allow easy installation 
and removal of the pump. When installed correctly it will seal and provide a means to lift the pump without disconnecting 
any of the discharge piping. Please ensure that installation is done as per the diagrams below. 

 
 
 
 

                                    

 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 
 
 

     
                                                 

   
 
 
 
 
 
 
 
 
 
 
 

 
   DISCONNECTED POSITION              PIPE GUIDE ASSEMBLY        OPERATING POSITION      

 

 
 

 

1-1/4" 
GUIDE RAIL PIPE 

1-1/4" 
DISCHARGE 
PIPE 

INSTALL 3/8X16 HEX BOLTS 
HERE. EVENLY TIGHTEN 
BOTH SIDES SO THAT 
GASKET IS PROPERLY 
COMPRESSED. 

ENSURE THAT RUBBER 
GROMMET IS PROPERLY 
INSTALLED HERE. 

ENSURE THAT 
GROMMET IS 
PROPERLY 
INSTALLED 

Содержание LSG202M

Страница 1: ...oting 7 Installation Manual 7759000A Q4800 Series Quadplex Grinder Systems 7000 Apple Tree Avenue Bergen NY 14416 Phone 800 543 2550 Fax 585 494 1839 www libertypumps com Features 48 Diameter Fibergla...

Страница 2: ...d with a grounding type plug that it is connected to a properly grounded grounding type receptacle Do not bypass grounding wires or remove ground prong from attachment plugs Do not remove cord and str...

Страница 3: ...asin to provide a solid level base that can support the weight of the filled basin If a concrete pad will be used under the basin the compacted stone sub base can be reduced to 6 inches 2 Connections...

Страница 4: ...will turn off The lead pumps switch will turn on two 2 of the four 4 grinder pumps and continue to the run the pumps until the water level falls to the off switch level The lag alarm switch will turn...

Страница 5: ...level Lag 3 level Alarm level Volume per pump cycle Total Basin capacity Q4884 13 33 cm 34 86 cm 40 102 cm 46 117 cm 52 132 cm 54 137 cm 164 5 gal 658 gal Q4896 13 33 cm 37 94 cm 43 109 cm 49 124 cm 5...

Страница 6: ...nnect terminals 6 and 8 to always operate two pumps when the lead pump is triggered Use another jumper wire to connect terminals 10 and 12 to always operate a separate pare of pumps when a lag pump is...