Troubleshooting
New Measurements Mode Warning Messages
Using the LI-6400
20-7
New Measurements Mode Warning Messages
In New Measurements mode, a variety of messages can appear in the second
line of the display. This section lists, in decreasing order of severity, the mes-
sages and their meanings.
These warning messages are generated by a function that runs every 10 sec-
onds while in New Measurements mode, so they appear or disappear at 10
second intervals. (A message may linger for up to 10 seconds after the offend-
ing condition has been remedied.)
These messages can be suppressed (and re-enabled) by pressing
ctrl
+
z
(in
New Measurements mode only). Also note that every time New Measure-
ments mode is entered, the messages are re-enabled automatically.
ÒBLOWN FUSE (Analyzer or Flow)Ó
Instruments having serial number 401 and above are equipped with a back
plane board that is modified to allow detection of a blown fuse. Two fuses can
be detected: the analyzer board fuse, and the flow board fuse. It cannot tell
which one is blown, just that one or both are blown. See
ÒIRGAs Not ReadyÓ
Refer to the discussion starting on page 20-14.
ÒHigh Humidity AlertÓ
The lowest value
T
of the three temperatures measured in or near the chamber
(analyzer block, chamber air, and leaf) is used to compute a relative humidity
RH
alert
:
(20-1)
where
W
s
is sample water concentration (mmol mol
-1
),
P
is ambient pressure
(kPa), and the function
e
s
() computes saturation vapor pressure (kPa) as a
function of temperature (C) (Equation (14-21) on page 14-10). If
RH
alert
ex-
ceeds 95%, the ÒHigh Humidity AlertÓ message appears. The usual remedy
is some combination of the following:
¥
Give the coolers a warmer target.
Perhaps youÕre asking for a block or leaf temperature that is too cold.
RH
alert
W
s
P
1000
------------
e
s
T
( )
--------------------
100
´
=
Содержание LI-6400
Страница 1: ...Using the LI 6400 Portable Photosynthesis System ...
Страница 15: ...Part I The Basics ...
Страница 16: ......
Страница 174: ...Making Measurements Answers to Questions 4 56 Using the LI 6400 4 ...
Страница 175: ...Part II Useful Details ...
Страница 176: ......
Страница 200: ...Standard Tools Power ON Hooks 5 24 Using the LI 6400 5 ...
Страница 214: ...Real Time Data Real Time Graphics 6 14 Using the LI 6400 6 ...
Страница 234: ...Environmental Control Light Control 7 20 Using the LI 6400 7 ...
Страница 244: ...Light Sensor Considerations Gallium Arsenide Phosphide GaAsP Sensor 8 10 Using the LI 6400 8 ...
Страница 288: ...Data Logging Making Your Own AutoPrograms 9 44 Using the LI 6400 9 ...
Страница 289: ...Part III Working With Files ...
Страница 290: ......
Страница 312: ...The LPL File System Troubleshooting 10 22 Using the LI 6400 10 ...
Страница 340: ...Downloading Files Using a Data Capture Program 11 28 Using the LI 6400 11 ...
Страница 375: ...Part IV Configuration Issues ...
Страница 376: ......
Страница 420: ...Defining User Variables Old Style vs New Style 15 18 Using the LI 6400 15 ...
Страница 454: ...Using an Energy Balance Further Reading 17 12 Using the LI 6400 17 ...
Страница 455: ...Part V Maintenance Troubleshooting ...
Страница 456: ......
Страница 572: ...Troubleshooting Useful Information 20 46 Using the LI 6400 20 ...
Страница 587: ...Diagnostics and Utilities Sys Utility Programs Using the LI 6400 21 15 EBVpd t C guess EBSatVap _EBvap_kPa ...
Страница 593: ...Part VI Programming ...
Страница 594: ......
Страница 622: ...Programming with LPL Compiler Directives 22 28 Using the LI 6400 22 ...
Страница 846: ...Index I 16 Using the LI 6400 ...