8
TABLE OF CONTENTS
ENGLISH
TABLE OF CONTENTS
2
IMPORTANT SAFETY INSTRUCTIONS
10
INSTALLATION TOOLS
11
INSTALLATION PLACES
11
Installation Places for Indoor unit
13
Installation Places for Outdoor Unit
14
Installation Guide at the Seaside
14
Seasonal Wind and Cautions in Winter
15
THE INDOOR UNIT INSTALLATION
15
Position of Suspension Bolt
18
Heat Insulation
18
Indoor Unit Drain Piping
19
WIRING CONNECTION
19
Electrical Wiring
20
Connecting cables to the Unit
21
Connecting cables to the Outdoor Unit
22
CONNECTING PIPES
22
Preparation of Piping
23
Connecting the pipings to the indoor unit and drain hose to drain pipe
24
Connection of piping - Outdoor
25
Forming the piping
26
PIPING LENGTH AND THE ELEVATION
27
INSTALLATION OF DECORATIVE PANEL(ACCESSORY)
29
LEAKAGE TEST AND EVACUATION
29
Preparation
29
Leakage test
30
Evacuation
31
TEST RUNNING
33
INSTALLATION PI485
34
EXTERNAL STATIC PRESSURE
35
SELF-DIAGNOSIS FUNCTION
35
Indoor Unit Error
36
Outdoor Unit Error
Содержание UBN24R
Страница 53: ...MAINTENANCE AND SERVICE 53 ENGLISH ...
Страница 54: ...54 ENGLISH ...
Страница 55: ...55 ENGLISH ...
Страница 56: ......