Installation Manual
9
Control Kit Installation
Control Kit Installation
Mechanical installation
1. Remove the Control Kit box cover by unscrewing the plastic (+) bolt(4EA).
2. Drill 4 holes on correct position and fix the Control Kit box securely with 4 screws(Field supply)
through the provided holes Ø4.5 mm(Reference the length of the holes Ø4.5)
298 mm
Provided holes
Ø4.5 mm (4EA)
189 mm
Содержание PUCKA0
Страница 20: ...20 AHU Control Kit ...
Страница 21: ...Installation Manual 21 ...
Страница 22: ......