
Installation Manual 15
ENGLISH
EEV Kit Installation
Electrical work
10. Open the terminal box cover(A).
11. Pass EEV cable(Field supply, 6 wires) from the AHU Control Kit through cable gland and connect
the cable wires into the terminal connector(C) following instructions as describe in step 12. Route
the cable out of the EEV Kit box according to figure below and fix with the support tie wrap(D).
A. Terminal box cover
B. Cable gland
C. Terminal connector
D. Support tie wrap
E. Electric wiring work(Field supply, 6 wires)
NOTE
1. BR : BROWN
2. RD : RED
3. BL : BLUE
4. OR : ORANGE
5. YL : YELLOW
6. WH : WHITE
A
B
D
E
B
R
R
D
B
L
O
R
Y
L
W
H
EEV
C
Detail
E
12. Use a screw) and follow indicated instructions for connecting cable wires into the
terminal connector according to the circuit diagram.
13. Make sure that field wiring and insulation is not squeezed when closing the EEV Kit box cover.
14. Close the EEV Kit box cover(4 x M4).
B
R
R
D
B
L
O
R
Y
L
W
H
EEV
Field work
Field connect wires
Connect
Label
B
R
R
D
B
L
O
R
Y
L
W
H
EEV
Detail
■
Before connecting the wires(Field supply), make sure to compare with the Connect
label between EEV Kit and Control Kit.
■
Make sure to connect the wires according to the circuit diagram in Control Kit.
CAUTION