21
Installation Manual
Due to our policy of continuous product innovation, some specifications may change without notification.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. “LG” is a registered trademark of LG Corp.
STANDARD WALL-MOUNTED
External Dimensions
Figure 5: ARNU053SJA4, ARNU073SJA4, ARNU093SJA4, ARNU123SJA4, ARNU153SJA4 Dimensions.
SJ Frame
Unit: Inch
Connecting vapor / liquid piping, drain hose
Attaching the installation plate, drilling hole
30-3/16
5-15/16
32-3/16
12-7/16
28-1/8
2-3/16
2-1/6
2-11/16
7-7/16
3/8
2-3/8
5/16
2-1/16
32-15/16
12-1/16
3-1
1/16
3-1
1/16
2-1/2
2-1/2
2-1/2
10-3/8
10-3/8
12-1/8
5-9/16
7-13/16
Ø
2-9/16
Ø
2-9/16
3-7/8
15/16
15/16
5-1/4
7-5/8
6
Approx. 18-1
1/16 to vapor piping.
Approx. 14-3/8 to liquid piping.
Approx. 12-3/16 to drain hose.
12-1/8
1-1/2
5-3/16
32-15/16
Knock Out Hole for
Refrigerant / Drain Piping
and Power W
iring /
Communication Cable
Drain Hose
Connection
Drain Hose
Connection
Installation Plate
Terminal Block
Location for Power /
Communication
Panel
Display and Remote
Controller Signal
Receiver
Communication
Line
Piping Direction
1. Unit should be installed in compliance with the installation manual.
2. Unit should be grounded in accordance with local, state, and federal codes and regulations.
3.
All field-supplied electrical codes and materials must comply with local, state, and federal codes and
regulations.
4. Review the electrical information provided in the engineering and installation manuals for instructions
on choosing the power wiring, circuit breaker; designing the electrical system; and installation.