Installation of Indoor
Installation Manual
19
ENGLISH
HEAT INSULATION
1. Use the heat insulation material for the refrigerant piping which has an excellent heat-
resistance (over 120°C).
2. Precautions in high humidity
circumstance:
This air conditioner has been tested
according to the "KS Standard
Conditions with Mist" and confirmed
that there is not any default. However, if
it is operated for a long time in high
humid atmosphere (dew point
temperature: more than 23°C), water
drops are liable to fall. In this case, add
heat insulation material according to the
following procedure:
• Heat insulation material to be prepared... Adiabatic glass wool with thickness 10 to 20mm.
• Stick glass wool on all air conditioners that are located in ceiling atmosphere.
Indoor unit
Thermal insulator
(accessory)
Fastening band
(accessory)
Refrigerant piping
1. PRECAUTIONS IN TEST RUN
• The initial power supply must provide at least 90% of the rated voltage.
Otherwise, the air conditioner should not be operated.
CAUTION
①
For test run, carry out the cooling operation firstly even during heating
season. If heating operation is carried out firstly, it leads to the trouble
of compressor. Then attention must be paid.
②
Carry out the test run more than 5 minutes without fail.
(Test run will be cancelled 18 minutes later automatically)
• The test run is started by pressing the room temperature checking button and down timer
button for 3 seconds at the same time.
• To cancel the test run, press any button.
CHECK THE FOLLOWING ITEMS WHEN INSTALLATION IS COMPLETE
• After completing work, be sure to measure and record trial run properties, and store measured
data, etc.
• Measuring items are room temperature, outside temperature, suction temperature, blow out
temperature, wind velocity, wind volume, voltage, current, presence of abnormal vibration and
noise, operating pressure, piping temperature, compressive pressure.
• As to the structure and appearance, check following items.
□
Is the circulation of air adequate?
□
Is the draining smooth?
□
Is the heat insulation complete
(refrigerant and drain piping)?
□
Is there any leakage of refrigerant?
□
Is the remote controller switch operated?
□
Is there any faulty wiring?
□
Are not terminal screws loosened?
M4......118N.cm{12kgf.cm}
M5......196N.cm{20kgf.cm}
M6......245N.cm{25kgf.cm}
M8......588N.cm{60kgf.cm}
Test running
Содержание MT11AH
Страница 29: ......