![LG MS-119 Скачать руководство пользователя страница 21](http://html.mh-extra.com/html/lg/ms-119/ms-119_service-manual_1899350021.webp)
5-11
COMPONENTS
TEST PROCEDURE
RESULTS
RELAY 2
FAN MOTOR
(Wire leads removed)
TURNTABLE
MOTOR
(Wire leads removed)
Check for continuity of relay 2 with an
ohm-meter.
(Remove wire leads from relay 2 and
operate the unit.)
Measure the resistance.
(Ohm-meter scale: R x 1)
Measure the resistance.
(Ohm-meter scale: R x 1 )
POWER
LEVEL
1
4 sec
18 sec
2
6 sec
16 sec
3
8 sec
14 sec
4
10 sec
12 sec
5
12 sec
10 sec
6
14 sec
8 sec
7
16 sec
6 sec
8
18 sec
4 sec
9
20 sec
2 sec
10
22 sec
0 sec
Normal:
A: Approx. 85 ~ 100 ohm.
B: Approx. 10 ~ 25 ohm.
Abnormal: Infinite or several
ohms.
Normal: Approx.100~150 ohm
Abnormal: Infinite or several
ohm.
NOTE : • A MICROWAVE LEAKAGE TEST MUST ALWAYS BE PERFORMED WHEN THE UNIT IS
SERVICED FOR ANY REASON.
• MAKE SURE THE WIRE LEADS ARE IN THE CORRECT POSITION.
• WHEN REMOVING THE WIRE LEADS FROM THE PARTS, BE SURE TO GRASP THE
CONNECTOR, NOT THE WIRES.
Relay 2
A
B
Содержание MS-119
Страница 28: ...6 2 13213A 13552A 13536A 14026A 14970A 13581A 15006A 14890A 13720D DOOR PARTS EV ...
Страница 31: ...43501A 43500A 466001 WSZ085 466003 466001 6 5 LATCH BOARD PARTS EV ...
Страница 33: ...63303L 63302L 647781 WTT028 63303R 63302R 368771 WTT021 WSZ002 948503 56170D 6 7 BASE PLATE PARTS EV ...
Страница 34: ...8 1 SCHEMATIC DIAGRAM OF P C B ...
Страница 35: ...8 2 PRINTED CIRCUIT BOARD ...
Страница 36: ......