5-12
COMPONENTS
TEST PROCEDURE
RESULTS
FUSE
H.V. FUSE
Check for continuity of the fuse with an
multi-meter.
NOTE: If the fuse is blown, check the primary, the secondary, and the monitor
switches, H.V.D. and H.V.C. before replacing the fuse.
If the fuse is blown by improper switch operation replace the defective switch
and the fuse at the same time. Replace just the fuse if the switches operate
normally.
Normal Abnormal
HEATER ELEMENT
(Wire leads removed.)
Measure the resistance.
(Multi-meter scale: Rx1)
Measure the resistance with 500V-100M ohm
insulation resistance meter.
NOTE: Make sure heater is fully cooled when tested.
Normal:
• Upper sheath heater:
Approx. 37 ohm (230V, 1350W)
• Back sheath heater:
Approx. 77 ohm (230V, 750W)
• Upper Halogen heater:
Approx. 15 ohm (230V, 450W)
(at 20 ~30°C)
MAGNETRON and OVEN
THERMOSTAT
OVEN Thermostat
0°C~160°C 160°C
M.G.T Thermostat
60°C~Approx.145°C
Over 145°C
Normal: more than 0.5 Mohm
LGE Internal Use Only
Copyright © 2007 LG Electronics. Inc. All right reserved.
Only for training and service purposes