Installation Manual
9
Installation
ENGLISH
Installation
Preparing work for Installation
Open panel front
1. First, push the front panel backward and lift it up to remove the two screws.
2. The moment of lifting the both lower parts of panel front, you can hear sound this panel came out,
In this time panel front is separated
3. After pull down this panel a bit, and separate connecting wire with product.
Remove cover pipe and cover side
1. Remove two screws(for fixing cover pipe)
2. Pull up the cover side of desired connecting di-
rection, then cover side is separated.
3. In case of connecting direction is left or right,
path through the hole of cover side.
CAUTION: After removing the pipe
hole, cut the burr for safety.
When connecting pipe path through rear
wall, donʼt remove the hole.
NOTICE
Drain hose junction
1. Remove the rubber stopple of desired direc-
tion of drainage.
2. As the following picture, Insert drain hose in
the handle of drain pan, and join drain hose
and connecting hose.
Panel Front
Connector
Pipe hole
rubber cap
Only one
desiring direction
Connecting
part
Adhesive
Drain
hose
Содержание MFL68019901
Страница 2: ...FLEX MULTI SPLIT INSTALLATION INSTRUCTIONS ...
Страница 22: ...22 Multi Air Conditioner ...