Installation
• Where optimum air distribution can be ensured.
• Where nothing blocks air passage and install the duct work.
• Where condensate can be properly drained.
• Where the ceiling is strong enough to bear the indoor unit weight.
• Where the false ceiling is not noticeably on an incline.
• Where sufficient clearance for maintenance and service can be ensured.
• Where piping between indoor and outdoor units is possible within the allowable limit. Refer to the
installation manual for the outdoor unit.
• Vertical Air Handling Unit can be installed for upflow and horizontal-left positions.
NOTE : The primary and secondary drain line must be trapped to allow proper drainage of condensate
water, If the secondary drain line is not used, it must be capped.
Selection of the best location
More than 23-5/8 inch
(600 mm)
clearance from
access panels
for Service
More than
10 inch
(250mm)
More than
10 inch
(250mm)
More than 14 inch
(350 mm)
More than 14 inch
(350 mm)
In the case of sea coast installation, salt residue may cause corrosion of cabinet and component
parts. Please take appropriate anti-corrosion measures.
8
Vertical Air Handling Unit
Installation
Содержание MFL65003102
Страница 2: ...2 Vertical Air Handling Unit ...
Страница 35: ......