5-12
COMPONENTS
TEST PROCEDURE
RESULTS
CIRCULATION MOTOR
(Wire leads removed)
NOTE :
A MICROWAVE ENERGY LEAKAGE TEST MUST ALWAYS BE PERFORMED WHEN THE UNIT IS
SERVICED FOR ANY REASON.
MAKE SURE THE WIRE LEADS ARE CORRECT POSITION.
WHEN REMOVING THE WIRE LEAD FROM THE PARTS, BE SURE TO GRASP THE
CONNECTOR, NOT THE WIRES.
Normal : COM-230V : Approx. 180
Ω
Abnormal : Infinite or several ohm.
Содержание MC-3182NBR
Страница 9: ...SCHEMATIC DIAGRAM 4 3 ...
Страница 31: ... 6 2 13551A 13581A 13650A 14810L 14810R 14270A WNZ027 13213A 14026A 13552A WSZ085 WTP005 WTP037 DOOR PARTS EV ...
Страница 37: ......