5-8
CAUTIONS
1. DISCONNECT THE POWER SUPPLY CORD FROM THE OUTLET WHENEVER REMOVING THE
OUTER CASE FROM THE UNIT. PROCEED WITH THE TEST ONLY AFTER DISCHARGING THE HIGH
VOLTAGE CAPACITOR AND REMOVING THE WIRE LEADS FROM THE PRIMARY WINDING OF THE
HIGH VOLTAGE TRANSFORMER. (SEE PAGE 2-1)
2. ALL OPERATIONAL CHECKS WITH MICROWAVE ENERGY MUST BE DONE WITH A LOAD (1 LITER
OF WATER IN CONTAINER) IN THE OVEN.
COMPONENTS
TEST PROCEDURE
RESULTS
HIGH VOLTAGE
TRANSFORMER
(Wire leads removed)
MAGNETRON
(Wire leads removed)
1. Measure the resistance.
(Ohm-meter scale: Rx1 and Rx100)
• Primary winding
• Secondary winding
• Filament winding
2. Measure the resistance.
(Ohm-meter scale: Rx1000)
• Primary winding to ground
• Filament winding to ground
1. Measure the resistance.
(Ohm-meter scale: Rx1)
• Filament terminal
2. Measure the resistance.
(Ohm-meter scale: Rx1000)
• Filament to chassis
Approx.: 2.0 ohm
Approx.: 150 ohm
Less than: 1 ohm
Normal: Infinite
Normal: Infinite
Normal: Less than 1 ohm
Normal: Infinite
FILAMENT
WINDING
TERMINAL
PRIMARY
TERMINAL
SECONDARY
TERMINAL
COMPONENT TEST PROCEDURE
LGE Internal Use Only
Copyright © 2007 LG Electronics. Inc. All right reserved.
Only for training and service purposes
Содержание MC-3089NBC
Страница 31: ... 6 2 DOOR PARTS EV 13552A 13581A 14026A 15006A 14970A 13213A 13551A 13806A WTT033 WTP013 WWS016 13650A ...
Страница 34: ... 6 5 WSZ085 466001 43500A 466003 44510A 466001 43501A LATCH BOARD PARTS EV ...
Страница 36: ... 6 7 63302A 63303A 647781 WTT030 WSZ002 WTT028 WTT021 56170D BASE PLATE PARTS EV ...
Страница 37: ......