5-11
COMPONENTS
TEST PROCEDURE
RESULTS
TIMER MOTOR
(Wire leads removed)
Measure the resistance.
(Ohm-meter scale: R x 100)
Measure the resistance.
(Ohm-meter scale: R x 1000)
Note: A is ON,OFF switch B is
power supply terminal of the
timer motor C is defrost switch
NOTE : • A MICROWAVE LEAKAGE TEST MUST ALWAYS BE PERFORMED WHEN THE UNIT IS
SERVICED FOR ANY REASON.
• MAKE SURE THE WIRE LEADS ARE IN THE CORRECT POSITION.
• WHEN REMOVING THE WIRE LEADS FROM THE PARTS, BE SURE TO GRASP THE
CONNECTOR, NOT THE WIRES.
C
(2-3)
B
(2-M)
A
(1-2)
A
B
C
A
Turn on
Approx. 250
Ω
Turn Off
B
FAN MOTOR
(Wire leads removed)
TURNTABLE
MOTOR
(Wire leads removed)
Normal:
Abnormal:
∞
or several
Ω
Normal: Approx. 100~200
Ω
Abnormal:
∞
or several
Ω
A ~ B
A ~ C
40 ~ 60
Ω
300~500
Ω
Содержание MB-4022G
Страница 9: ...4 3 SCHEMATIC DIAGRAM ...
Страница 26: ...6 1 EXPLODED VIEW INTRODUCTION ...
Страница 27: ...6 2 13581A 14970A 14026A 13552A 13536A 13213A 14890A 13720D DOOR PARTS ...
Страница 28: ...6 3 24781T 26549T WTT021 249401 23572A 368771 249402 CONTROL PANEL PARTS ...
Страница 30: ...6 5 466001 43500A WSZ085 466003 466001 44510A LATCH BOARD PARTS ...
Страница 32: ...6 7 56170D 63302A 65006B WTT021 WSZ002 63303A BASE PLATE PARTS ...
Страница 33: ...P NO 3828W5S3283 June 2003 Printed in Korea ...