- 9 -
Drill and prepare the ceiling so that it can
accommodate the product (refer to page 8 for
product size).
1
Connect the 3 product cables to the interior
wiring of the building. For finishing cap, use
standardized products.
Connect the 3 product cables to the interior
wiring of the building. For finishing cap, use
standardized products.
2
3
Installation
Product Configuration and Information, Size
Make sure to turn off the main power switch off the installation space
before connection.
Connect so that the colors of the 3 power cables match.
(LIVE: BROWN, NEUTRAL: BLUE, P.E.: GREEN/YELLOW)
Product’s power cables
Interior wiring of the building
NEUTRAL
LIVE
P.E.
[Completed installation]
WARNING
MFL67082801,REV06,��.indd 9
11. 7. 12. �� 11:16