- 16 -
Copyright ©2008 LG Electronics. Inc. All right reserved.
Only for training and service purposes
LGE Internal Use Only
■
Installation of Unit
Install the unit above the ceiling correctly.
• Apply a joint-canvas between the unit and duct to
absorb unnecessary vibration.
• Apply a filter Accessory at air return hole.
• Install the unit leaning to a drainage hole side as
a figure for easy water drainage.
• A place where the unit will be leveled and that
can support the weight of the unit.
• A place where the unit can withstand its vibration.
• A place where service can be easily performed.
Drainage hole
M10 Nut
M10 SP. washer
M10 washer
X 4
X 4
(Local
supply)
X 4
M10 Nut
M10 SP. washer
M10 washer
X 4
X 4
(Local
supply)
X 4
A
B
C
1-3mm
D
(G)
H
I
E
F
CASE 1
POSITION OF SUSPENSION BOLT
CASE 2
POSITION OF CONSOLE BOLT
A
B
C
D
E
F
(G) H
I
36K BTU
1242 1180 492 54
600
30
87 830 186
(Unit:mm)
Dimension
Capacity
2. Ceiling dimensions and hanging bolt location
Содержание LB-F3660CL
Страница 41: ...P NO 3828A30074M APRIL 2008 ...