- 56 -
4. Trouble Shooting
4.4 Baseband Part Troubleshooting
4.4.1 Power On Trouble
4.4.1.1 Power-On Trouble Troubleshooting
z
Power-On Sequence
- Connecting Battery
- Power-On Key Detection
- Pwon signal goes to ABB and then ABB resets DBB by ONOFF signal
- ONNOFF turns low(0v) to High (2.8V) and it resets DBB (Neptune)
- All LDOs (internal LDOs of ABB and external LDOs) are turned on
z
Check Points
- Battery Voltage
- Power-On Key Detection (Pwon signal)
- Output of LDOs
z
Trouble Shooting Setup
- Connect PIF-UNION to the phone.
- Set the TI-remote switch at PIF-UNION off.
z
Trouble Shooting Procedure
- Check Battery Voltage
- END_KEY Dome Switch condition& Side FPCB condition
- Check the output voltages of all LDOs.
LGE Internal Use Only
Copyright © 2008 LG Electronics. Inc. All right reserved.
Only for training and service purposes
Содержание KM710
Страница 1: ...Date May 2008 Issue 1 0 Service Manual Model KM710c Service Manual KM710c Internal Use Only ...
Страница 123: ... 124 LGE Internal Use Only Copyright 2008 LG Electronics Inc All right reserved Only for training and service purposes ...
Страница 129: ... 130 LGE Internal Use Only Copyright 2008 LG Electronics Inc All right reserved Only for training and service purposes ...
Страница 139: ... 140 LGE Internal Use Only Copyright 2008 LG Electronics Inc All right reserved Only for training and service purposes ...
Страница 173: ...Note ...
Страница 174: ...Note ...