Major repair method for freezing cycle
- 39 -
Connecting the pipe
Connect the red hose to the high pressure side and the blue
hose to the low pressure side.
Vacuuming order
Open valve 1 and 2 to vacuum for 40 minutes and then
close valve 1.
Working order
1) After completing the vacuuming, check the refrigerant
amount for each model.
2) Using the vacuum pump, make the bombe vacuum.
3) Measure the refrigerant charging amount
- Using an electric weight, measure the weight of the
vacuum bombe.
- After charging the refrigerant in the bombe, calculate and
measure the weight.
4. Vacuuming
5. Refrigerant charging
Item
Caution
3
1
2
3-Way
Valve
Condenser
Hot Line Pipe
Vacuum
pump
Evaporator
Compressor
Drier
High pressure
side
Low
pressure
High
pressure
Blue
Yellow
Red
Indicates the weight of
empty bombe
- Room temperature
must be around 25°C
during the operation.
- Control the refrigerant
charging amount as
follow; -5g in winter and
+5g in summer.
Key Point
Refrigerant amount=Weight after charging -
Weight before charging (Bombe weight)
Calculation of refrigerant charging amount
- When vacuuming,
connect the power to
increase the vacuum
effect.
- When sucking the
refrigerant operate the
compressor. (Inserting
refrigerant is easier
and surer.)
Key Point