![LG Code Zero A9 Series Скачать руководство пользователя страница 15](http://html.mh-extra.com/html/lg/code-zero-a9-series/code-zero-a9-series_manual_221523015.webp)
-15-
How to use
CAUTION
•
Avoid dropping the product and parts when taking them
out of the package. It may damage the product and/or
cause personal injury.
•
Do not use double-sided tape to anchor the charging
station on papered walls. Please use the provided screws
as otherwise the wall paper will get torn by movement of
the charging station during the docking of the unit.
•
We recommend anchoring the station with the anchoring
screw.
•
Use the anchoring screws only when the wall is made of
concrete or is solid enough. An unsuitable wall can cause
the mountings to weaken and cause the Charging station
to fall causing injury and damage the property or product.
•
Do not store the product or battery in the accessory bag
except for the inlet ports and flexible hose extension.
•
Be careful not to throw or drop the accessory bag carrying
accessories such as the inlet ports. It may damage the
product and/or cause personal injury.
•
* The accessory bag is provided only for an applicable
model.
Please note
•
The charging station, its pipe and support cannot be
disassembled separately once they have been assembled,
and the charging station has been attached to the wall.
•
If necessary, the charging station and the nozzle cradle
can be separated from the charging station pipe. Pull the
charging station upward and separate it in sequence while
the charging station support is in a fixed state.
Installing the wall-mount station
1
Connect the power adapter to the port on the back of
the charging station and plug the power cord into the
power outlet.
2
Ensure that there are no Electrical wires or water pipes
inside the wall where the wall mount bracket will be
attached to. By drilling or screwing, make a hole 1 meter
from the floor to insert the wall plug or screw anchor.
•
Recommended diameter of hole:
Φ
6.5; Recommended
depth: 60 mm.
3
Anchor the station to the wall with the provided
anchoring screws.
1
Wall anchoring
hole
Anchoring
screw for wall-
mount type
Screw
anchor
Please note
•
A service request to change the installation location of the
charging station will incur additional costs if required to do so
by a qualified installer.
•
The Detachable stand for the nozzles and the Detachable
stand for mop pads cannot be separated once they are
assembled.
Uninstalling the station
Keep and charge the product on the charging station after
separating extension pipe and nozzle from the product body.
CAUTION
•
Leaving the extension pipe and nozzle assembled for a long
time may cause damage the product.
Содержание Code Zero A9 Series
Страница 38: ... 38 Circuit diagram Station PCB ...
Страница 39: ... 39 Circuit diagram Main PCB Mop Nozzle Motor PCB Mop Nozzle ...
Страница 40: ... 40 Circuit diagram Main PCB Power ...
Страница 41: ... 41 Circuit diagram Micom ...
Страница 42: ... 42 Circuit diagram Inverter ...
Страница 46: ... 46 Exploded diagram A9 Flufy Nozzle Assembly AGB01 MCK001 MCK6101 AGM001 AEM747 EAU301 MCR401 MCR501 AHR701 ...
Страница 49: ... 49 Exploded diagram A9 Base Assembly Body EBR801 AAN701 ...
Страница 50: ... 50 Exploded diagram A9 Base Assembly Lower AAN801 ...
Страница 52: ... 52 Exploded diagram A9 EAY401 EAC201 EBZ001 AGR201 AGR301 ...
Страница 53: ... 53 Exploded diagram A9 AGB403 Power Punch Nozzle ...
Страница 54: ... 54 Exploded diagram A9 Carpet Nozzle AGB402 AHR702 AGM002 EAD902 ...
Страница 55: ... 55 Exploded diagram A9 Power Drive Mini Nozzle AGB405 ...
Страница 56: ......