- 65 -
4 . TROUBLE SHOOTING
Checking Flow
SETTING : Enter the engineering mode, and set vibrator on at vibration of BB test menu
START
Is the voltage at pin 3
of U401 high?
YES
YES
YES
YES
NO
NO
NO
NO
NO
NO
YES
YES
YES
Check the soldering
of R315, R399
Check the soldering
of C300
Check the soldering
of C300
Replace U401
Replace U401
Replace vrbrator
Vibrator
working
Resolder R315, R399
Resolder C300
Resolder C300
Is the voltage at pin 1
of U401 high?
Is the voltage at pin 5
of U401 high?
Содержание B2050
Страница 7: ... 6 2 PERFORMANCE 2 PERFORMANCE 2 1 H W Features ...
Страница 8: ... 7 2 PERFORMANCE ...
Страница 9: ... 8 2 PERFORMANCE 2 2 Technical Specification ...
Страница 10: ... 9 2 PERFORMANCE ...
Страница 11: ... 10 2 PERFORMANCE ...
Страница 12: ... 11 2 PERFORMANCE ...
Страница 13: ... 12 2 PERFORMANCE ...
Страница 53: ... 52 4 2 TX Trouble TEST POINT 13Mhz OSCILLATOR Mobile SW FEM TRANCEIVER LDO PAM 4 TROUBLE SHOOTING ...
Страница 57: ... 56 3 Checking Ant SW Mobile SW 4 TROUBLE SHOOTING ...
Страница 67: ... 66 TEST POINT 4 6 LCD Trouble 4 TROUBLE SHOOTING ...
Страница 70: ... 69 4 TROUBLE SHOOTING TEST POINT 4 7 Speaker Trouble ...
Страница 77: ... 76 4 TROUBLE SHOOTING 4 10 KEY backlight Trouble TEST POINT ...
Страница 91: ... 90 5 DOWNLOAD AND CALIBRATION 6 Press Start and Pover on the phone using JIG remote Power on Switch 1 ...
Страница 92: ...5 DOWNLOAD AND CALIBRATION 91 5 2 Calibration ...
Страница 93: ... 92 5 DOWNLOAD AND CALIBRATION ...
Страница 97: ......
Страница 103: ... 102 Figure 8 1 B2050 BOTTOM SIDE PCB LAYOUT 8 PCB LAYOUT ...
Страница 104: ... 103 8 PCB LAYOUT Figure 8 1 B2050 TOP SIDE PCB LAYOUT ...
Страница 105: ......
Страница 113: ...10 STAND ALONE TEST 112 ...
Страница 117: ......
Страница 119: ......
Страница 132: ... 131 ...
Страница 133: ... 132 ...