Roughing In the Indoor Unit
1. Determine the installation location. Ensure the
location has enough space to allow necessary duct
connections and maintenance access.
2. Select and Mark the position for fixing bolts
3. Drill the hole for set anchor on the face of ceiling.
Figure 9: Drill the hole
4. Securely install the four field-provided threaded rod
hangars to the overhead support locations.
-. Insert the set anchor and washer onto the
suspension bolts for locking the suspension blots
on the ceiling
-. Mount the suspension bolts to the set anchor
firmly.
-. Secure the installation plates onto the suspension
bolts (adjust level roughly) using nuts, washers
and springs washers.
Figure 10: Ceiling Anchor Installation
5. Hang the chassis from the four field-supplied
threaded rod hangars. Refer to the threaded rod
hangar details in Figure 11.
6. Use a level to ensure the chassis is level and
securely tighten the mounting nuts.
7. If local code requires an auxiliary drain pan under
the unit, install a field-provided auxiliary drain pan.
8. Connect ductwork to the unit as necessary.
Figure.11: Threaded Rod Hanger and Attaching Hardware
Figure.12: Split Compact DOAS Unit Dimensions
.
Table.14: Dimensions and Weights
.
Chassis
Code
Weight
(lbs.)
Major Dimensions (in.)
Mounting
Dimensions(in.)
W
H
D
M1
M2
M3
M4 M5
DC
390
75
21.7 45.1 77.2 37.3 1.1
6.8 0.9
M2
W
M1
D
H
M3
M4
M5
7. Securely install threaded rod hangars (bolts) and hardware
to prevent the chassis falling from its installation location.
There is risk of equipment or property damage from falling
equipment.
8. Use a level indicator to ensure the chassis is installed on a
level plane
CAUTION : Tighten the nut and bolt
to prevent unit falling.