- Gas Supply Requirements
- Connect the Supply Gas Line
- Installation of Additional Regulator
- Test the System for Leaks
- Gas Pressure Test Ports
Sequence of Operation----------------------------------------------------------------------------------------------------------76
- Start-Up / Standby
- Heat Mode
- Recovery from Lockout
Performance Data-----------------------------------------------------------------------------------------------------------------76
Start-Up
– Furnaces (all units) -------------------------------------------------------------------------------------------------77
- 4:1 Turndown Electronic Modulation
- Adjust High Fire and Low Fire Settings
- Modulating Valve High Fire Setting
- Modulating Valve Low Fire Setting
- With High Turndown Electronic Modulation
Troubleshooting---------------------------------------------------------------------------------------------------------------------81
- Ignition Controller
- 4:1 Modulating with Stand-Alone Controller
- 4:1 Modulating with Microprocessor Controller
Reference: Controls----------------------------------------------------------------------------------------------------------------90
- Furnace Control with Microprocessor
Maintenance--------------------------------------------------------------------------------------------------------------------------91
- Combustion Blower Motor
- Burners and Orifices
- Heat Exchanger
- Flue Collector Box
- Electrical Wiring
- Gas Train
- Replacement Parts
Maintenance Log---------------------------------------------------------------------------------------------------------------------92
Controller
Overview--------------------------------------------------------------------------------------------------------------------------------95
- Keypad Description ----------------------------------------------------------------------------------------------------------------98
- Expansion Boards-------------------------------------------------------------------------------------------------------------------98
- Connecting to the Web UI---------------------------------------------------------------------------------------------------------98
- Service Password-------------------------------------------------------------------------------------------------------------------98
- Startup Settings----------------------------------------------------------------------------------------------------------------------98
- Expansion Board Addresses and Dip Switch Settings --------------------------------------------------------------------98
- IP Address-----------------------------------------------------------------------------------------------------------------------------99
- Main Board Terminal Connections----------------------------------------------------------------------------------------------99
- Expansion Board Terminal Connections---------------------------------------------------------------------------------------98
Software Backup and Restore-------------------------------------------------------------------------------------------------------100
AC Smart Setup-------------------------------------------------------------------------------------------------------------------------102
Navigation ------------------------------------------------------------------------------------------------------------------------------- 106
Unit Status Overview --------------------------------------------------------------------------------------------------------------108
Menu ---------------------------------------------------------------------------------------------------------------------------------------111
Содержание AR-DE12-05A
Страница 38: ...Factory Installed Refrigeration System Components Air Source Heat Pump with Three Way Hot Gas Reheat ...
Страница 75: ...Gas Supply In Typical Split Burner Manifold ...
Страница 94: ...NOTE For HMA gas furnace for 311 and 352 chassis see separate IOM Manual ...
Страница 96: ...HANDHELD KEYPAD DISPLAY OPTIONAL ...
Страница 105: ......
Страница 107: ......
Страница 108: ......
Страница 109: ......
Страница 110: ......
Страница 111: ......
Страница 112: ......
Страница 113: ......
Страница 114: ......
Страница 115: ......
Страница 116: ......
Страница 117: ......
Страница 118: ......
Страница 119: ......
Страница 120: ......
Страница 121: ......
Страница 122: ......
Страница 123: ......
Страница 124: ......
Страница 125: ......
Страница 126: ......
Страница 127: ......
Страница 128: ......
Страница 129: ......
Страница 130: ...Controls Sequence of Operation ...
Страница 131: ......
Страница 132: ......
Страница 133: ......
Страница 134: ......
Страница 135: ......
Страница 136: ......
Страница 137: ......
Страница 138: ......
Страница 139: ......
Страница 140: ......
Страница 141: ......
Страница 142: ......
Страница 143: ......
Страница 144: ......
Страница 145: ......
Страница 146: ......
Страница 147: ......
Страница 148: ......
Страница 149: ......
Страница 150: ......
Страница 151: ......
Страница 152: ......
Страница 153: ......
Страница 154: ......
Страница 155: ......
Страница 156: ......
Страница 157: ......
Страница 158: ......
Страница 159: ......
Страница 160: ......
Страница 161: ......
Страница 162: ......
Страница 163: ......
Страница 164: ......
Страница 165: ......
Страница 166: ......
Страница 167: ......
Страница 168: ......
Страница 169: ......
Страница 170: ......
Страница 171: ......
Страница 172: ......
Страница 173: ......
Страница 174: ......
Страница 175: ......
Страница 176: ......