30
Ceiling Concealed Duct
50Hz • R410A • Heat Pump
50Hz • R410A • Heat Pump
Installation
Outdoor
Indoor
A
view
1
1
Main
power source
Switch box
Circuit Breaker
A
Control terminal board
Control box
Control box cover
(On which the Electric
Wiring Connection is put)
Cord clamper
Connection
cord between
the indoor unit
and the
outdoor unit
Remote
control cord
Main terminal board
Control terminal board
Cord
clamper
Cover control
Cover control
Main terminal board
Control terminal board
Main terminal board
Control terminal board
ELECTRICAL WIRING
Perform the electrical wiring work according to the electrical
wiring connection.
• All wiring must comply with local requirements.
• Select a power source that is capable of supplying
the current required by the air conditioner.
• Use a recognized circuit breaker between
the power source and the unit. A disconnection
device to adequately disconnect all supply lines
must be fitted.
• Capacity of circuit breaker
INDOOR UNIT
• Remove the control box cover for electrical
connection between the indoor and outdoor unit.
(Remove crews
➀
.)
• Use the cord clamper to fix the cord.
WIRING CONNECTION
OUTDOOR UNIT
• Remove the control cover for wiring connection.
• Use the cord clamper to fix the cord.
• Earthing work
Connect the cable of diameter 1.6mm
2
or more to
the earthing terminal provided in the control box
and do earthing.
Please check !!
Capacity
1 Phase
24k Btu/h
35A
30k Btu/h
50A
36k(GTA0)Btu/h
50A
36k(GSA0)Btu/h
35A
42k Btu/h
40A