FLARING WORK AND CONNECTION OF PIPING
ENGLISH
- For the units with capacity more than 48
kBtu/h, the installation piping is connectable
in four directions.(refer to figure 1)
- When connecting in a downward direction,
knock out the knockout hole of the base pan.
(refer to figure 2)
Preventing foreign objects from entering
(Figure3)
- Plug the pipe through-holes with putty or
insulation material(procured locally)to stop up
all gaps,as shown in the figure 3.
- Insects or small animals entering the outdoor
unit may cause a short circuit in the electrical
box.
Outdoor unit
Continuous
Forward
Sideways
Backward
Knock-out
Base pan
Downward
Gas side piping
(Bigger Dia.)
Liquid side piping
(Smaller Dia.)
Putty or insulating material
(produced locally)
Torque wrench
Drain hose
Connecting wire
Connection pipe
<Figure 1>
<Figure 2>
<Figure 3>